4 ANALYZER INITIAL START-UP

PREPARING THE ANALYZER FOR START-UP

4.1
Once installation is complete, proceed as follows to prepare the analyzer for online operation :
1. Connect the sample line inlet tubing (or filtered sample outlet coming from optional
filtration system) to the fast-loop reservoir using the bottom connection on the reservoir.
Then connect the analyzer sample tubing to the top connection on the reservoir.
2. Connect the analyzer sample tubing as follows:
a. For single channel analyzers, connect the sample to connection #1 on the inlet
block, and the standard to connection # 2.
b. For dual channel instruments, connect sample #1 to connection #1, sample #2 to
connection #2, and the standard to connection #3.
3. Connect the drain fitting of the fast-loop reservoir(s) to the waste line
4. Put the reagent inlet tubing into the appropriate reagent containers
a. Reagent 1 = Ferrozine Reagent
5. Connect the analyzer drain tubing to the waste drain line
WARNING!
6. Adjust sample flow to the fast loop reservoirs to 100-500 ml/min.
7. Turn the analyzer on using the switch in the electronics compartment
8. Perform reagents prime (see Section 6.1)
9. Perform calibration (see Section 6.2 & 6.3)
10. Set the analyzer to online mode (see Section 6.5)
Waltron User Manual 101-024-B.1
3048 Dissolved Iron Analyzer
Before proceeding with analyzer start-up it is absolutely
necessary to check that all procedures for a proper
installation and reagent preparation have been made.
Please verify that all instructions have been followed.
The drain of the analyzer must be at ambient pressure with
no restriction. Please verify that this condition has been
strictly followed during initial start-up procedures.