Location

Use the following guidelines to select a suitable location for
these units.
1.
Unit is designed for outdoor installation only.
2.
Condenser must have an unlimited supply of air. Where a
choice of location is possible, position unit on either north
or east side of building.
3.
For ground level installation, a level pad or slab should be
used. The thickness and size of the pad or slab used
should meet local codes and unit weight. Do not tie the
slab to the building foundation.
4.
For roof top installation, be sure the structure can support
the weight of the unit plus any field installed components.
Unit must be installed on a level roof curb or appropriate
angle iron frame providing adequate support under the
compressor/condenser section.
5.
Maintain level tolerance of unit to 1/8" maximum.
Do not permit overhanging structures or shrubs to
obstruct condenser air discharge outlet, combustion air
inlet or vent outlets.
Clearances
All units require certain clearances for proper operation and
service. Refer to Table 4 for the clearances required for
construction, servicing and proper unit operation.
Figure 2: Unit 4 Point Load Weight
Weight (lbs.)
Size
(Tons)
Shipping Operating
024
360
355
(2.0)
030
380
375
(2.5)
036
405
400
(3.0)
042
425
420
(3.5)
048
445
440
(4.0)
060
495
490
(5.0)
4
FRONT
OF
UNIT
"A"
49-1/8
X
Center of Gravity
4 Point Load Location (lbs.)
X
Y
A
22.25
25
96
22.25
25
102
22.25
25
109
22.25
25
114
22.25
25
120
22.25
26
137

Rigging And Handling

Exercise care when moving the unit. Do not remove any
packaging until the unit is near the place of installation. Rig the
unit by attaching chain or cable slings to the lifting holes
provided in the base rails. Spreader bars, whose length
exceeds the largest dimension across the unit, MUST be used
across the top of the unit.
If a unit is to be installed on a roof curb other than a UP
roof curb, gasketing must be applied to all surfaces that
come in contact with the unit underside.
Before lifting, make sure the unit weight is distributed
equally on the rigging cables so it will lift evenly.
Units may be moved or lifted with a forklift. Slotted openings in
the base rails are provided for this purpose.
All panels must be secured in place when the unit is
lifted.
The condenser coils should be protected from rigging
cable damage with plywood or other suitable material.
"D"
CENTER OF
GRAVITY
"B"
47-1/4
Y
B
C
D
84
81
93
89
86
98
95
92
105
100
96
110
104
101
115
122
109
122
"C"