2
Fit the attachment as shown in the figure below, ensuring it is aligned correctly. The alignment lug on
the lower stage should locate in the slot on the Smart Swap base. To aid in this alignment, there is a
mark on the Peltier plate.
Figure 11 Fitting the attachment (DHR Series shown).
3
Connect the power cable and, if necessary, the fluid hoses.
Figure 12 Connecting power cable and fluid hoses (DHR Series shown).
4
When the green status light turns off, the rheometer is ready for use.
DHR/AR Series Peltier Plate Getting Started Guide
Alignment mark and slot
Power cable
Fluid hoses
Page 19