Model assembly
Vertical stabilizer installation
Vertical Stabilizer Installation
1.Slide the vertical tail into the slot in the fuselage.
Note: Connect the rudder servo connectors to the servo extensions in the fuselage.
Missiles and Oil Tank Installation
1.Slide the missiles and oil tank into the rails.
Scale Part Installation
1.Carefully apply CA to the base and side of the pocket as
shown.
2.Secure the vertical tail in place using the included screws.
2.Carefully place the plastic part into the pocket.
5
E
N
Need help?
Do you have a question about the EDF Jet 70mm F-18F V2 PNP and is the answer not in the manual?
Questions and answers