Emerson Daniel PT Installation And Maintenance Instructions Manual page 41

Liquid turbine meters
Table of Contents

Advertisement

Installation and maintenance instructions
3-9008-011
5. Position meter housing horizontally with one hanger blade in the vertical top
6. Strike upstream end of shaft with a soft headed hammer, loosening downstream
7. Remove downstream hanger assembly from downstream end of meter housing.
Installation and maintenance instructions
position. Slowly push (or tap) downstream end of shaft into downstream hanger
hub.
Insert a punch or metal rod into the removal hole of the downstream hanger hub.
hanger assembly. Remove the metal rod from the downstream hanger assembly.
Figure 5-5: Step 6
Care should be taken not to drop hanger blades.
Disassembly and assembly instructions
October 2019
41

Advertisement

Table of Contents
loading

Table of Contents