Secure The Rail Assemblies To The Cabinet; Installing The Front End Of The Rail; Installing Screws - Dell EMC PowerProtect DD6400 System Expansion Manuallines

Hide thumbs Also See for EMC PowerProtect DD6400 System:
Table of Contents

Advertisement

Figure 7. Installing the front end of the rail
6. Repeat the preceding steps to install the right rail assembly.

Secure the rail assemblies to the cabinet

The supplied screws and washers are used to secure the rail assemblies to the front and rear of the cabinet.
About this task
NOTE:
For square hole cabinets, install the supplied conical washer before installing the screw. For unthreaded round hole
cabinets, install only the screw without the conical washer.
Steps
1. Align the screws with the designated U spaces on the front and rear rack flanges.
Ensure that the screw holes on the tab of the system retention bracket are seated on the designated U spaces.
2. Insert and tighten the two screws using the Phillips #2 screwdriver.
Figure 8. Installing screws
14
Install the System in the Rack

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EMC PowerProtect DD6400 System and is the answer not in the manual?

Table of Contents

Save PDF