Siemens SIMATIC ET 200eco PN M12-L Equipment Manual page 51

Hide thumbs Also See for SIMATIC ET 200eco PN M12-L:
Table of Contents

Advertisement

EtherNet/IP
5.2 Diagnostics
RN/
NS
Flashes
Flashes
PWR LED
Table 5- 4
P1 LK and P2 LK LEDs
Table 5- 5
P1 LK
50
LEDs
ER/
MT/
MS
IO
Flashes
Flashes
Flashes
Flashes
Status display of the PWR LED
PWR LED
Meaning
Load voltage 2L+ is missing or too low
Off
Load voltage 2L+ present
On
Error display of the P1 LK and P2 LK LEDs
LEDs
P2 LK
There is no Ethernet connection between the com-
munications interface of your IO device and a com-
Off
munication partner (e.g. scanner).
There is an Ethernet connection between the com-
munications interface of your IO device and a com-
On
munication partner (e.g. scanner).
The "Node flash test" is running (the RN/NS, ER/MS
and MT/IO LEDs also flash).
Flashes
Digital inputs/outputs DIQ 16x24VDC/0.5A/2A M12-L 8xM12 (6ES7143-6BH00-0BB0)
Meaning
Hardware or firmware defective.
The "Node flash test" is running (the P1 LK
and P2 LK LEDs are also flashing).
Meaning
You can read out
the service data
with MFCT.
Remedy
Check whether the bus cable
to the switch/communication
partner is interrupted.
---
---
Equipment Manual, 02/2022, A5E46571210-AC
Remedy

Advertisement

Table of Contents
loading

Table of Contents