Section 4 – Inspections Before Operation
4.2 Visual and daily
maintenance inspections
Do an inspection of the MEWP in this sequence.
WARNING
Do not operate a MEWP that does not function
correctly. Lock and tag the MEWP , and remove it
for servicing. Only a qualified service technician
must repair the MEWP . If you do not obey, there is
a risk of death or serious injury.
WARNING
Turn the main power disconnect switch to the
off position before you do the visual and daily
maintenance inspections. If you do not obey, there
is a risk of death or serious injury.
CAUTION
Make sure that the MEWP is on a firm, level
surface before you do the visual and daily
maintenance inspections. If you do not obey, there
is a risk of machine damage.
221844ACAI
34

Visual and daily maintenance inspections

4.2-1 Labels

Refer to
in this manual for the labels. Make
Section 8
sure all the labels are in the correct location, are in good
condition, and you can read them.

4.2-2 Electrical

Do a check on these areas for chafed, corroded, and
loose wires:
Base to platform cables and wiring harnesses
Battery and motor controller wiring harnesses
Hydraulic and electrical wiring harnesses.

4.2-3 Hydraulic

Do a check on these areas and make sure there are
no signs of leakage:
Hydraulic tank, gauge, filter, fittings, hoses
All hydraulic cylinders
All hydraulic manifolds
The ground area below the MEWP
Outriggers (optional equipment).