Required Software; Evaluation Board Feature Identification Summary; References; Evm Feature Locations - Texas Instruments ADS54J69EVM User Manual

Table of Contents

Advertisement

www.ti.com
1.2

Required Software

The following software is required to operate the ADS54J69EVM and available online. See
Section 1.4
for links.
ADS54Jxx EVM GUI
The following software is required to operate the TSW14J56EVM and available online. See
Section 1.4
for links.
High Speed Data Converter Pro software, version 4.1 or higher
HSDC Pro GUI Updates (Rev. I) for High Speed Data Converter Pro Software, version 4.0 or lower
1.3

Evaluation Board Feature Identification Summary

The EVM features are labeled in
+5-V Input Power
Connector
USB Connector
(Backside)
Channel B
Analog Input
External
ADC Clock
Input
Channel A
Analog Input
1.4

References

ADS54Jxx EVM software, available at:
ADS54J69 datasheet (SBAS713), available at
LMK04828 datasheet (SNAS605), available at
TSW14J56EVM User's Guide (SLWU086), available at
High Speed Data Converter Pro software (SLWC107) and User's Guide (SLWU087), available at
www.ti.com/tool/dataconverterpro-sw
HSDC Pro GUI Updates (SLWC106), available at
NOTE: Schematics, layout, and BOM are available on the
www.ti.com.
SLAU662B – January 2016 – Revised May 2016
Submit Documentation Feedback
Figure
1.
ADC
ADC Reset Switch
Figure 1. EVM Feature Locations
www.ti.com/tool/ADS54J69EVM
www.ti.com/product/ADS54J69
www.ti.com/product/lmk04828
Copyright © 2016, Texas Instruments Incorporated
LMK04828
Reference
Input
www.ti.com/tool/TSW14J56EVM
www.ti.com/tool/dataconverterpro-sw
ADS54J69EVM
product page on
Overview
References,
References,
FMC
Connector
(Backside)
3
ADS54J69EVM

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ADS54J69EVM and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Ads54j69

Table of Contents