Cuppone MANTEGNA MN40/1DG-A5P-CP Installation Manual

Cuppone MANTEGNA MN40/1DG-A5P-CP Installation Manual

Electric oven with rotating deck

Advertisement

M A N T E G N A
Electric oven with rotating deck
MN40/1DG
INSTALLATION

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MANTEGNA MN40/1DG-A5P-CP and is the answer not in the manual?

Questions and answers

Summary of Contents for Cuppone MANTEGNA MN40/1DG-A5P-CP

  • Page 1 M A N T E G N A Electric oven with rotating deck MN40/1DG INSTALLATION...
  • Page 2: Table Of Contents

    Installation | Smoke extraction ......................11 Do not hesitate to contact him in case of doubt. Installation | Electrical connection ....................12 Installation | Electrical diagrams ....................14 CUPPONE since 1963 CUPPONE S.R.L. Installation | Test ............................16 Via Sile, 36 31057 Silea (TV) - ITALY...
  • Page 3: Checks Before Purchasing

    C H E C KS B E F O R E PU R C H A S I N G Before purchasing the oven and before its installation, check and agree with the owner that, on installation, all the following conditions are met; they are indispensable for the correct and safe installation, operation and maintenance of the oven.
  • Page 4 C h e c ks b e f o r e p u r c h a s i n g Inform the owner about the necessary electrical arrangements (activities to be carried out by a qualified electrician) √ For a correct connection: ■...
  • Page 5: Oven Technical Data

    OVE N T E C H N I CA L D ATA | O ve r a l l d i m e n s i o n s 726mm 28,58in 229mm B: Safety thermostat 664mm 26,16in 9,02in reset 670mm 26,38 in 708mm 27,86in A: Oven cable supply input...
  • Page 6: Technical Data | Cooking Chamber Dimensions And Productivity

    OVE N T E C H N I CA L D ATA | Co o k i n g c h a m b e r d i m e n s i o n s a n d p ro d u c t i v i t y Productivity Model per hour...
  • Page 7: Safety Instructions

    S A F E TY I N S T R U C T I O N S SYMBOLS USED IN THE MANUAL • Failure to follow these regu- technicians that are authorised by the lations may cause damage Manufacturer, in compliance with the AND ON THE LABELS APPLIED TO or even fatal injury, subse- regulations in force in the user coun-...
  • Page 8 S a f e t y i n s t r u c t i o n s • The serial plate provides important The company cannot be held liable for any print or transcription • (Appliances without either power cable or plug) errors, reserving the right to make changes where deemed technical information.
  • Page 9: Installation| Transport And Preliminary Operations

    I N STA L L AT I O N | Tr a n s p o r t a n d p re l i m i n a r y o p e r a t i o n s TRANSPORT AND POSITIONING Fig.5 Fig.3...
  • Page 10: Installation | Positioning

    I n s t a l l a t i o n | Po s i t i o n i n g POSITIONING ON A BASE Fig.6 Fig.6 - Fig.7 min.1000 mm. Carefully place the oven on its base. [40 in.] 726 mm min.
  • Page 11: Installation | Smoke Extraction

    I n s t a l l a t i o n | S m o ke ex t r a c t i o n SERIAL NUMBER PLATE READING Fig.8 Model Year of production Fig.8 The serial number is on the right hand side of the ap- pliance.
  • Page 12: Installation | Electrical Connection

    I n s t a l l a t i o n | E l e c t r i c a l c o n n e c t i o n ELECTRICAL CONNECTION Fig.10 Before installing the appliance, check that sys- AC 230 tems comply with the regulations in force in the country where it is going to be used and...
  • Page 13 I n s t a l l a t i o n | E l e c t r i c a l c o n n e c t i o n omnipolar circuit ■ must be connected to an Fig.12 Fig.11 breaker...
  • Page 14: Cuppone Since 1963 Installation | Electrical Diagrams

    I n s t a l l a t i o n | E l e c t r i c a l d i a g r a m s AC 1X230V+T 50-60HZ °C motor SSR_A1 SSR_B1 A2 - A2 - 230Vac/12Vac 50VA...
  • Page 15 AC 3-N-400V+T 50-60HZ motor bottom SSR_A1 SSR_B1 motor A2 - A2 - 230Vac/12Vac 50VA probe optional 12Vac Serial supply Abbreviation PIN description Terminal board Bottom heating element Top heating element Single-phase safety thermostat CN4 CN5 LC filter Transformer 230V-12V 50VA SSR_A1 Top SSR SSR_B1...
  • Page 16: Cuppone S.r.l. Installation | Test

    I n s t a l l a t i o n | Te s t PRE-TESTING AND FINAL √ Positioning checks INSPECTION Is the installation room adequate and compliant with regulations? (correct ventilation, maximum/mini- mum temperature, etc.) The oven is checked and tested in the Manufacturer’s plant before being delivered to the customer.
  • Page 17 3-5 Belgrave Industrial Estate Honeywell Lane Oldham OL8 2JP 0161 633 5797 sales@llkpizzapros.co.uk www.llkpizzapros.co.uk...

This manual is also suitable for:

Mantegna mn40/1dg-c5p-cpMantegna mn40/1dg-a5-cp

Table of Contents