Installation Procedure
Pre-Installation Requirements
You must meet the following conditions for the successful installation of the dual
power option:
SSP version installed that supports dual power grid installation
Internal boot disks and other peripheral devices (except hub, AC sequencer, and
Remote Power Control Module (RPCM) Shelf) relocated to external cabinet
Five additional NEMA L6-30Rs (for North America) from another power source
available (four if no AC sequencer is installed)
3