Page 9
Amphenol 明书 Rev.: A PCD Shenzhen Page: 9 of 13 Subject: Assembly Instruction for HVSL 1000 2P&3P Connector Eff. Date: 2013-08-20 The contact assy. as below position, and the braid should be handled according to the figure. 编织要可见,伸出外套 不超过 1mm。...
Rev.: A PCD Shenzhen Page: 12 of 13 Subject: Assembly Instruction for HVSL 1000 2P&3P Connector Eff. Date: 2013-08-20 Orient Plug and Receptacle and insert slowly, when insert properly, the lever is latched with “Click”; then push the CPA on locked position in order to warranty locked finally.
Page 13
Rev.: A PCD Shenzhen Page: 13 of 13 Subject: Assembly Instruction for HVSL 1000 2P&3P Connector Eff. Date: 2013-08-20 Press the secondary lock using middle finger, at the meanwhile, continuously pull out the plug and rotate the lever clockwise until the plug separate completely.
Need help?
Do you have a question about the HVSL 1000 2P and is the answer not in the manual?
Questions and answers