End Suction Centrifugal
10. DISMANTLING AND ASSEMBLY
Assembly, disassembly, and repair of the pump, should only be performed by specialist
maintenance technicians. Otherwise, error by personnel, can result in serious physical injury and/
or equipment damage.
1. Before performing any installation or maintenance tasks:
- Disconnect and lock-out power to the driver.
- Make sure that all replacement parts, and tools are available
2. Use proper lifting method: The unit and the components can be heavy.
3. To prevent injury, allow all system and pump components to cool before handling.
4. To eliminate possible exposure to any hazardous or toxic fluids:
- Identify contents in the pump.
- Observe proper decontamination procedures.
- Wear proper personal protective equipment (PPE).
- Handle and dispose of pumped fluid in compliance with the applicable environmental regulations.
5. To avoid injury:
- Wear appropriate gloves while handling parts. Some components can have sharp edges.
Scan the QR Code to access the
Dismantling and Assembly Instructions
11.
REPAIR AND WARRANTY
Scan the QR Code to access the
EPAC Standard Warranty
EBARA
PUMPS AMERICAS CORPORATION
www.pumpsebara.com
(t) 803.327.5005
(f) 803.327.5097
GS Series
22
rev. 03/22