Overview; Ref35Evm Features - Texas Instruments REF35EVM User Manual

Evaluation module
Table of Contents

Advertisement

Overview

1 Overview
The REF35EVM is a voltage reference evaluation module that demonstrates the REF35 integrated circuit from
Texas Instruments (TI).
The REF35 is an ultra-low power voltage reference with maximum 10 ppm/C temperature drift. The REF35 is
used primarily as a voltage reference for low power data converters.
The REF35 can be operated from V
This device comes with a enable pin that allows the device to be set in shutdown mode. Under the shutdown
condition, the REF35 only consumes 0.1 μA of current. The REF35 is optimal for a wide range of applications
such as flow transmitters, blood glucose monitors, servo drive control modules, power quality analyzers, fault
indicators, oscilloscopes and process analytics.
The REF35EVM features a user selectable wide VIN input which uses a
the user to widen the input range to 40 V if so desired.. The VIN header can be connected to an external power
supply to provide power. All of the REF35 input and output pins are accessible for external connection via test
headers.

1.1 REF35EVM Features

Includes: REF35125QDBVR
Footprints for resistors and capacitors
Multiple outputs for voltage measurements
KEY PARAMETERS
Supply Voltage (VREF):
Supply Voltage (VLDO)
Enable Pin
Fixed Output Voltage:
Output Current:
Applying voltages above the limitations given in this table may cause permanent damage to your
hardware.
2
REF35EVM User's Guide
+ V
to 6 V. The REF35 uses only 1.4 μA of current in active mode.
REF
DO
PARAMETER
IN_VREF
IN_LDO
EN
VREF
IOUT
CAUTION
Copyright © 2022 Texas Instruments Incorporated
TPS7B8150
linear regulator, allowing
PARAMETER LIMITS
0 V – 6 V
0 V to 40 V
0 V to IN_VREF
1.25 V (REF35125QDBVR)
-5 mA to 10 mA
SNAU276 – JANUARY 2022
Submit Document Feedback
www.ti.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the REF35EVM and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents