C
1
HAPTER
L
A
IMIT
NALYSER
PRESSURE
WARNING
NOTE
S
I
AFTY
NSTRUCTIONS
Work on hydraulic and pneumatic equipment
●
Maintenance and repair of hydraulic and pneumatic equipment shall be
carried out by specially trained personnel !
●
Before all maintenance and repair work, the pneumatic and hydraulic
equipment of the system / machine must be depressurised !
●
Hose pipes in preventive maintenance should be changed regularly, even
if here is no visible damage (Please note the information provided by the
manufacturer)
●
Before starting up after maintenance or repair work:
→ Check the screw connections for a tight fit.
→ Ensure that the container lid, screens or filters are reinstalled in the
correct order.
●
After completion of the maintenance and repair services, and before the
resumption of production, make sure that...
→ ...all the materials, tools and other equipment required for the execution
of maintenance or repair work are removed from the work area!
→ ...any leaked fluids were removed !
→ ...all safety devices of the system work properly again !
Transport
Use appropriate equipment to transport the system to prevent damage during
transport.
●
Transport equipment carefully and do not throw !
●
Choose a cool and dry storage location.
●
Pay attention to the permitted ambient temperatures !
●
Check the entire delivery immediately upon receipt for completeness and
shipping damage
●
Devices are packed in a transport-safe packaging. Nevertheless, it can
lead to damage in transit. Please tell the transport company and the
manufacturer in writing IMMEDIATELY - no later than eight days after
receiving the goods - of the details of the damage. In this case, you must
keep the instrument and the packaging for inspection for the further
processing of the complaint.
P
9
AGE