Mitsubishi Electric E70 Series Connection Manual page 140

Hide thumbs Also See for E70 Series:
Table of Contents

Advertisement

(2) MITSUBISHI CNC Machine operation panel A (Key switch/LED)
MITSUBISHI CNC Machine operation panel A is equipped with 55 switches and 55 LEDs.
They are allocated X device and Y device as in the figure below.
X/Y
X/Y
80
81
X/Y
X/Y
84
85
X/Y
X/Y
88
89
X/Y
X/Y
8D
8C
X/Y
X/Y
90
91
(Note1)
If the stations of MITSUBISHI CNC Machine operation panel and other RIO unit overlap, all the connections of
the overlapping RIOs will be invalidated and cannot be used. Stations which do not overlap can be used.
(Note2)
Refer to the last page "Table: Device No. for MITSUBISHI CNC Machine operation panel" for the device No.
when connecting to RIO3.
4.5 Connection of MITSUBISHI CNC Machine Operation Panel
X/Y
X/Y
X/Y
X/Y
82
83
94
95
X/Y
X/Y
X/Y
X/Y
87
99
86
98
X/Y
X/Y
X/Y
X/Y
8A
9C
8B
9D
X/Y
X/Y
X/Y
X/Y
8E
8F
A1
A0
X/Y
X/Y
X/Y
X/Y
93
92
A4
A5
E70 Series Connection Manual
X/Y
X/Y
X/Y
X/Y
A8
A9
97
96
X/Y
X/Y
X/Y
X/Y
AC
9B
AD
9A
X/Y
X/Y
X/Y
X/Y
E
9
B0
9F
B1
X/Y
X/Y
X/Y
X/Y
A2
A3
B4
B5
X/Y
X/Y
X/Y
X/Y
B8
B9
A6
A7
X/Y
AA
X/Y
AE
X/Y
B2
X/Y
B6
X/Y
BA
115

Advertisement

Table of Contents
loading

Table of Contents