ABB Oy, Drives Service
Department
Date
ESP300
13.08.2018
1.2
Content
The purpose of this document is to specify on-site maintenance and repair actions of ACx580-01
frame sizes R0 – R5. Following actions are included in this document:
•
Control unit replacement
•
Cooling fan replacement
1.3
Required tools
•
ESD field service kit
•
Cross head screwdriver
•
Flathead screwdriver
•
Torxhead screwdriver
1.4
Maintenance schedule
Maintenance schedule is available at ABB library. Contact your local ABB representative for more
information.
© Copyright 2018 ABB Oy. All rights reserved. Specifications subject to change without notice.
On-Site Service Instructions
ACx580-01 R0-R5
Document nbr
3AXD10000303478
Related to material
Revision
Page
F
4 (41)