SANY SY26U Operation And Maintenance Manual page 129

Hide thumbs Also See for SY26U:
Table of Contents

Advertisement

SY26U Excavator OMM
1. Park the machine on firm, level ground, raise the dozer
blade, and swing the upper structure to the rear of the
machine.
2. Fully extend the arm cylinder and the bucket cylinder.
Raise the boom.
3. Place the hydraulic lockout control lever in the locked
(closed) position.
4. Turn the key to OFF and remove from the key switch.
5. Turn the battery disconnect switch to OFF.
6. Lock right access door and engine hood.
7.
Cover the exhaust opening to prevent contamination.
8. Use wire ropes and a container spreader bar that have
adequate length to keep the machine free from damage.
9. Lift the machine 10 in.–12 in. (25 cm–30 cm) and
check its balance. If it is not balanced, lower the
machine to the ground and adjust the boom or dozer
blade positions.
SANY
Fig. 4-78
Fig. 4-79
Operation and Maintenance Manual — 1119
Machine Operation
0002953
0002955
4-55

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents