Download Print this page

Advertisement

Quick Links

General Instructions
03DTSHPN1208FGC32TWSA-V1
DIP TREATED SHIPLAP PENT 12FT X 8FT FULLY GLAZED CONCENTINA 3 2 TALL WINDOW
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips
screwdriver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
LOCATION FOR YOUR GARDEN BUILDING
A minimum of 60cm should be left around the perimeter of your garden building to allow access for
maintenance, annual treatment and to allow air ow around the building.
Where possible you should avoid placing your garden building underneath large trees to prevent the tree
causing damage to the building.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions. For the duration of
heavy or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur
during excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided
but can be helped. It is suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
Once your garden building has been installed it will need to be treated as soon as possible and annually to
prevent the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee.
Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof
treatment to prevent water ingress
Pressure Treated buildings - Require a waterproof treatment to prevent water ingress
Log Cabins - Are supplied untreated and require a preservative and waterproo ng treatment.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base
dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The
cladding should overlap the base, creating a run o for water. It is also recommended that the oor be at least
25mm above the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens
products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting
or using this product.
Please retain product label and instructions for future reference
x2
All buildings should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly, you
will need a tape measure to
check dimensions of
components.
**Protim Aquatan T5 (621)**
Your building has been dip treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct
application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and
garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
REGISTER FOR YOUR
ANTI-ROT
GUARANTEE TODAY
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
Screws & Nails
Bolts
To identify the
xings required
Measure
Measure
for each step use a
overall
under the
measuring tape.
length
head
PLEASE SCAN HERE:
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 03DTSHPN1208FGC32TWSA-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 03DTSHPN1208FGC32TWSA-V1

  • Page 1 It is also recommended that the oor be at least 25mm above the surrounding ground level to avoid ooding. Mercia Garden Products Limited, Sutton On Trent, TYPES OF BASE Newark, - Concrete 75mm laid on top of 75mm hard-core.
  • Page 2 03DTSHPN1208FGC32TWSA-V1 Please retain product label and instructions for future reference Overall Dimensions: Width = 3618mm Depth = 2471mm Height = 2162mm Base Dimensions: Width = 3517mm Depth = 2395 mm Before assembly please make sure you have a suitable base ready to erect your...
  • Page 3 Please retain product label and instructions for future reference Nail Bag *This building can be built with the shed on the LEFT hand side. Follow the Fixing kit cont.. same steps but be aware to position panels to the opposite side.* There may be extra screws present in the nail bag Step 2 IMPORTANT: Pre-drill before xing screws.
  • Page 4 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. Step 4 Step 6 IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 3 QTY 1 Parts Needed - No. 6 QTY 1 - No. 4 QTY 1 Place the Long Window Panel (No.
  • Page 5 Please retain product label and instructions for future reference Step 8 Step 10 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 1 QTY 1 Parts Needed - No. 21 QTY 1 - No. 22 QTY 1 Place the Door Panel (No.
  • Page 6 Please retain product label and instructions for future reference Please retain product label and instructions for future reference Step 11 Step 13 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 20 QTY 1 Fix the edge of the Internal Panel Framing (No.
  • Page 7 Please retain product label and instructions for future reference Step 15 Step 17 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 17 QTY 1 Parts Needed - No. 32 QTY 2 - No. 42 QTY 3 - No.
  • Page 8 Please retain product label and instructions for future reference Step 20 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Step 18 Parts Needed - No. 10 QTY 2 Parts Needed - No. 8 QTY 1 Lay the 2x Veranda (No. 10) face down, Place the Storage Door panel (No.
  • Page 9 Please retain product label and instructions for future reference Step 24 IMPORTANT: Pre-drill before xing screws. Step 22 Parts Needed - No. 12 QTY 2 Parts Needed - No. 9 QTY 3 Place the Under Roof Panels (No. 12) into Place the Roof Panels (No.
  • Page 10 Please retain product label and instructions for future reference Step 26 Step 27 IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 35 QTY 1 Once the Roof is aligned and secure the Cut the Felt (No. 35) into 3 sheets at 3700mm Floor can be xed into position.
  • Page 11 Please retain product label and instructions for future reference Step 28 IMPORTANT: Pre-drill before xing screws. Step 30 IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 30 QTY 4 Parts Needed - No. 38 QTY 2 - No. 31 QTY 2 - No.
  • Page 12 Please retain product label and instructions for future reference Step 32 IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 44 QTY 4 Attach two Turn Buttons (No. 44) to the Storage Door Panel at the top and bottom of the door. Using 1x 30mm screw per Turn Button ensuring that the screws go through into the Storage Door Panel framing.
  • Page 14 REGISTER FOR YOUR PLEASE SCAN HERE: ANTI-ROT GUARANTEE TODAY...