Download Print this page
Mercia Garden Products 03DTSHPN0806FGD1TW-V1 General Instructions Manual

Mercia Garden Products 03DTSHPN0806FGD1TW-V1 General Instructions Manual

Dip treated shiplap pent 8ft x 6ft fully glazed double 1 tall window
Hide thumbs Also See for 03DTSHPN0806FGD1TW-V1:

Advertisement

Quick Links

General Instructions
03DTSHPN0806FGD1TW-V1
DIP TREATED SHIPLAP PENT 8FT X 6FT FULLY GLAZED DOUBLE 1 TALL WINDOW
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screw-
driver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
LOCATION FOR YOUR GARDEN BUILDING
A minimum of 60cm should be left around the perimeter of your garden building to allow access for maintenance,
annual treatment and to allow air ow around the building.
Where possible you should avoid placing your garden building underneath large trees to prevent the tree causing
damage to the building.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions. For the duration of heavy
or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during
excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be
helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine
and sheltered as much as possible during rain or snow.
Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent
the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee.
Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof treat-
ment to prevent water ingress
Pressure Treated buildings - Require a waterproof treatment to prevent water ingress
Log Cabins - Are supplied untreated and require a preservative and waterproo ng treatment.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base
dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The cladding
should overlap the base, creating a run o for water. It is also recommended that the oor be at least 25mm above
the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens
products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or
using this product.
Please retain product label and instructions for future reference
x2
All buildings should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly, you
will need a tape measure to
check dimensions of
components.
**Protim Aquatan T5 (621)**
Your building has been dip treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building has been treated by the
correct application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and
garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
REGISTER FOR YOUR
ANTI-ROT
GUARANTEE TODAY
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
Screws & Nails
Bolts
To identify the
xings required
Measure
Measure
for each step use a
overall
under the
length
measuring tape.
head
PLEASE SCAN HERE:
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 03DTSHPN0806FGD1TW-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 03DTSHPN0806FGD1TW-V1

  • Page 1 For assistance please contact customer care on: 01636 821215 TYPES OF BASE Mercia Garden Products Limited, - Concrete 75mm laid on top of 75mm hard-core. Sutton On Trent, - Slabs laid on 50mm of sharp sand.
  • Page 2 03DTSHPN0806FGD1TW-V1 Please retain product label and instructions for future reference Overall Dimensions: Width = 2468mm Depth = 2331mm Height = 2170mm Base Dimensions: Width = 2350mm Depth = 1753mm Before assembly please make sure you have a suitable base ready to erect your...
  • Page 3 Please retain product label and instructions for future reference Nail Bag Step 1 Parts needed - No. 1 QTY 1 There may be extra screws present in the nail bag - No. 9 QTY 1 - No. 10 QTY 1 50mm Screw QTY 86 25mm Screw QTY 22 - No.
  • Page 4 Please retain product label and instructions for future reference Step 3 Step 5 Parts needed - No. 6 QTY 2 Parts needed - No. 3 QTY 1 - No. 5 QTY 1 Place the assembled oor panels (No. 6) upside down onto a rm and Connect the Back Panel (No.
  • Page 5 Please retain product label and instructions for future reference Step 7 Step 9 Parts needed - No. 1 QTY 1 Parts needed - No. 7 QTY 2 Fix the Door Panel (No. 1) between the Place the Roof Panels (No. 7) onto the top Single Window Panel (No.
  • Page 6 Please retain product label and instructions for future reference Step 11 Step 13 Parts needed - No. 8 QTY 1 Screw internally with 6x50mm screws securing the roof panels (No. 7) at Place the Under Roof Panel (No. 8) into the front and back of the building.
  • Page 7 Please retain product label and instructions for future reference Step 14 Step 15 Parts needed - No. 25 QTY 1 Parts needed - No. 16 QTY 2 - No. 17 QTY 2 Cut the Felt (No. 25) into 3 sheets at 2550mm each and lay onto the roof.
  • Page 8 Please retain product label and instructions for future reference Step 16 Step 17 Parts needed - No. 11 QTY 1 Parts needed - No. 12 QTY 1 - No. 24 QTY 8 - No. 13 QTY 1 Position the Window (No. 11) central into Fix the rain guards (No.
  • Page 9 Please retain product label and instructions for future reference Step 19 Step 20 Parts needed - No. 26 QTY 2 Parts needed - No. 18 QTY 2 - No. 19 QTY 1 Attach the two turn buttons (No. 26) to the secondary door at the top and bottom On the inside of the building x using 2x30mm screws.
  • Page 10 Please retain product label and instructions for future reference Step 21 It is recommended that after the construction, treatment and the removal of the protective window cover that sealant is used to keep the building weather tight. It is ESSENTIAL that you apply wood 1.
  • Page 12 REGISTER FOR YOUR PLEASE SCAN HERE: ANTI-ROT GUARANTEE TODAY...