Field Equipment Installation And Cabinet Maintenance; Overview; Field Equipment Installation; Tools - ADC PG-FlexPlus PG-CAB001 Manual

Table of Contents

Advertisement

July 19, 2004
F
E
IELD
QUIPMENT
O
VERVIEW
This section covers the field installation of equipment into the cabinet and addresses maintenance items. This
section only covers the field installation of equipment into cabinets that have been pre-cabled for that equipment.
F
E
IELD
QUIPMENT

Tools

The tools and equipment needed for field installation are as follows:
• Blade screwdriver
• Cable ties
• Marker pen
• Metric socket set
• Screw-holding blade screwdriver (optional)

Generic Equipment Installation Procedure

Follow the generic installation procedure for installing equipment shelves or subracks into a cabinet that has been
pre-cabled for that equipment. This procedure can also be used if the wiring was not preinstalled at the factory but
was ordered and is now on hand for installation into the cabinet. Reference the cabinet Schematic Diagram for a
description of how the cables are routed through the cabinet and approximately where interconnections should take
place.
Field installation of some cabling is difficult after other equipment has been installed in the rack.
Do not install field installed equipment in a location that blocks airflow to the circuit packs in the access
electronics or optical multiplexer.
1. Locate the Schematic Diagram (block wiring diagrams) to determine the factory recommended location and
connections for the equipment.
2. If the cabinet was pre-cabled, identify, on the schematic, all of the power, alarm, and transmission connec-
tions to be made and locate each of them in the cabinet.
3. If the cabinet was not pre-cabled, install the cabling in the cabinet using the cable routing shown in the sche-
matic as a guide.
4. Unpack the equipment and identify all required connections to cabinet cabling.
5. Install the shelf or subrack into the equipment rack in the location shown on the schematic diagram using at
least two screws on each side of the shelf (four total).
6. Mate all cabinet wiring to subrack connectors as shown on the Schematic Diagram.
7. Once the equipment is installed and all connections made, neatly dress and secure all cables.
ADC Telecommunications, Inc.
I
NSTALLATION AND
I
NSTALLATION
C
M
ABINET
AINTENANCE
SCP-PGCAB001-010-01H
45