Table of Contents

Advertisement

Quick Links

BRAVO 10 - 48/120
User Manual V1.1
BEYOND THE INVERTER
THE NEW GENERATION OF POWER CONVERTERS
DUAL INPUT INVERTER
Commercial Power as default source
AC BACKUP IN A DC ENVIRONMENT
Leverage your existing DC infrastructure
ONE STOP SHOP
Wide output power range
HARSHEST AC INPUT CONDITIONS
Without compromising the quality of the AC output
Copyright © 2022. Construction electroniques & telecommunications S.A.
All rights reserved. The contents in document are subject to change without notice.
The products presented are protected by several international patents and trademarks.
Address: CE+T S.a, Rue du Charbonnage 12, B 4020 Wandre, Belgium
www.cet-power.com - info@cet-power.com
Belgium, China, India, Luxembourg, Malaysia, Russia, United Kingdom, United States, Australia & Germany
 www.cet-power.com

Advertisement

Table of Contents
loading

Summary of Contents for CE+T Power BRAVO 10 - 48/120

  • Page 1 BRAVO 10 - 48/120 User Manual V1.1 BEYOND THE INVERTER THE NEW GENERATION OF POWER CONVERTERS • DUAL INPUT INVERTER Commercial Power as default source • AC BACKUP IN A DC ENVIRONMENT Leverage your existing DC infrastructure • ONE STOP SHOP Wide output power range •...
  • Page 2: Table Of Contents

    6.4.5 Three Phase Configuration - 208 Vac ................6.4.6 AC Input and Output ....................... 6.4.7 DC ..........................6.4.8 Bravo 10 System with Inview S - Connections ..............6.4.9 Signalling ........................- Bravo 10 - 48/120 - User manual - v1.1...
  • Page 3 14.2.1 Single phase (L-N) ......................14.2.2 Single phase (L-N) - REG ....................14.2.3 Single shelf - Split phase (L1-L2-N) ................14.2.4 Single shelf - Split phase (L1-L2-N) - REG ..............- Bravo 10 - 48/120 - User manual - v1.1...
  • Page 4 14.2.5 Two shelves - Split phase (L1-L2-N) ................14.2.6 Two shelves - Split phase (L1-L2-N) - REG ..............14.2.7 Three phase (L1-L2-L3-N) ....................14.2.8 Three phase (L1-L2-L3-N) - REG ..................- Bravo 10 - 48/120 - User manual - v1.1...
  • Page 5 Release Note: Release date Version Modified page number Modifications (DD/MM/YYYY) 07/02/2022 First release of the manual 09/09/2022 Updated the shelf connections - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 6: Introduction To Ce+T

    Introduction to CE+T 1. Introduction to CE+T CE+T Power designs, manufactures and markets a range of products for industrial operators with mission critical applications, who are not satisfied with existing AC backup systems performances, and related maintenance costs. Our product is an innovative AC backup solution that unlike most used UPS’s •...
  • Page 7: Abbreviations

    Printed Circuit Board Protective Earth (also called Main Protective Conductor) Power Regular SNMP Simple Network Management Protocol TCP/IP Transmission Control Protocol/Internet Protocol True Redundant Structure Urgent Alarm Universal Serial Bus - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 8: Warranty And Safety Conditions

    • This product is suitable for use in a computer room. * These instructions are valid for most CE+T Products/Systems. Some points might however not be valid for the product described in this manual - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 9: Installation

    • Remove weight from the cabinet by unplugging the inverters. Mark inverters clearly with shelf and position for correct rebuild. This is especially important in dual or three phase configurations. • Empty inverter positions should not be left open. Replace with blank module or cover. - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 10: Surge And Transients

    To download the latest documentation and software, please visit our website at www.cet-power.com - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 11: Eci Technology

    1 Information and data given in this chapter is intended to serve as an overview of the ECI Technology. Detailed features and parameters for each individual module type in the range may differ and should be referred to in the dedicated data sheet. - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 12: On-Line Mode

    Start, control and exit are fully automatic. The Walk-in mode where the transfer from DC source to AC source is ramped up within a fixed and adjustable period of time. - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 13: Building Blocks

    Material (casing) Zinc coated steel AC Input Data Nominal voltage (AC) / Current 120 Vac / 7.2 A Voltage range (AC) 95 - 140 Vac Brownout < 108 Vac linear decreasing - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 14 300386 v1.9.1 / FCCpart 15 class A * Permanent 800 W / derating apply based on internal heatsink T°. ** Operation within lower voltage networks leads to de-rating of power performances. - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 15: Sub-Rack

    So the Inview Slot controller should be placed only at the left side of the first slot in the shelf, while you are looking from the front. - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 16 By default, Inview Slot works on 48 Vdc from battery/rectifier source. If DC is not present, it takes +12 V from external Auxiliary power supply converter (AC to DC). Shelf Rear Modbus (RS485) D1 D2 Power - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 17: Inview S

    • Power: The unregulated separate +12 V power supply is required for powering Inview S and this power should not be shared with other devices. (CET can provide Auxiliary Power Supply converter and the part number is T602004120). - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 18: System Installation

    • Generators supplying emergency AC to the building and to the converter should be sized at a minimum of two times the kVA rating of the converter. - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 19: Mounting Kit For Bravo 10 Shelf

    7. Similarly, fix the other side of the shelf and insert modules in the corresponding slot. Hex socket screw Philips head screw Place the shelf in the cabinet and fix it Insert the modules in the shelf - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 20: Cable Routing And Fixation

    1/4-20 inch Nut with torque 5.7 to 8.3 ft-lb. C : 0.56 K : 0.28 WIRE RANGE L : 1.06 Y : 0.70 Z : 0.28 N : 0.27 T : 0.09 All dimensions are in inch - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 21: Electrical Installation For Bravo 10 Shelf

    Electrode Terminal Bravo 10 - 48/120 - Shelf Rear Details - REG (No AC Input) Note: In REG version, a copper plate is placed between PE and Neutral. Also, ground should be connected to Grounding electrode terminal using 10-24 inch nut of torque 3.2 to 4.8 ft-lb.
  • Page 22: Single Phase Configuration - 120 Vac

    AC IN DC + DC - 6.4.3.1 Single phase configurations with Inview Slot and S Single phase with Inview Slot - 4 kVA Single phase with Inview S - 5 KVA - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 23: Split Phase Or Single Phase Configuration - 240 Vac

    Split phase with Inview Slot - 4 kVA Phase 1 Phase 2 Used Split phase with Inview Slot - 8 kVA Phase 1 Phase 2 Split phase with Inview S - 10 kVA - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 24: Three Phase Configuration - 208 Vac

    Phase 1 Phase 2 Used Phase 3 Used Three phase with Inview Slot - 12 kVA Phase 1 Phase 2 Phase 3 Three phase with Inview S - 15 kVA - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 25: Ac Input And Output

    15 kVA / 12 kW 42 A 60 A 4 AWG (L1-L2-L3-N) * One conductor / pole - 90°C Note: The Icc value measured as 60 Arms per shelf with five modules. - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 26 For each shelf, the DC breaker should be a separate branch protection (MCB) to distribute the DC. • The Inner hole diameter of the DC lug (two holes) should be 1/4”, and it is recommended to use only the supplied screws. - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 27: Bravo 10 System With Inview S - Connections

    • The remote ON/OFF switch the output AC OFF. • Input AC and input DC is not affected by the remote ON/OFF. - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 28 CAN bus cables. • The internal bus connectors are sensitive and special caution should be taken during installation to keep them out of harms way. - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 29: Interface

    80 to 100% = <5% 100% Output Power (redundancy not counted) overload × × × × × Status output power LED × Behaviour (B - Blinking | P - Permanent ) - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 30: Inview Slot - Lcd Display

    Three LED’s are present behind the front black plastic of the controller to indicate major alarm, minor alarm, and system status. These LED’s are not visible until they illuminate during the corresponding action occurs. Front black plastic (Red) Major alarm (Orange) Minor alarm (Green) System status - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 31: Menu Structure

    • Battery • Active power • Time power (kW) • Apparent • DC Power (kVA) • Module • Apparent configured Power (kVA) • System status - OK, OFF, AL and NT/KO - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 32: Inview S - Lcd Interface

    ƒ Alarms and Logs 7.3.1 LED indications Three LED’s are present at front side of the controller to indicate major alarm, minor alarm, and system status. Major Alarm Minor Alarm System Status - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 33: Menu Structure

    • Configured modules • Apparent power • Load current • Frequency • Configured modules • Redundancy status • Power factor • Load power • Module status • Installed power • Battery temperature - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 34: Lcd Interface - Terminology

    Note: If any parameter is changed, an authentication page appears. Enter the display PIN password to apply changes. Cutoff alarms Buzzer sound will be muted Logs Display the latest 100 events occurred. Information Displays product and network details - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 35: Inview S And Inview Slot - Web Interface

    RS485 Devices Users Ethernet Devices Software Update Configuration Files Explorer Inventory Downloads Files Battery Reports Languages Administration SNMP MIB Web Server Support Session Information Time Management SSL Certificate Events Log Licensing - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 36: Login

    An auto-logout feature is available to avoid a user being connected all the time. When no action is performed for more than 10 minutes, the session will expire and goes to login screen. 7.5.2 Interface Areas 1  Header 2  Main Page - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 37 5  S ystem Information: Displays system information such as Converter System, DC System, Site, Energy system, Sensors and Actuators details. (Note: System information screen varies depending upon the topology selection.) - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 38: Web

    Page or section collapse Particular section opens in a new tab Particular section open as a pop-up Drop down list – more options are present Delete / Clear the corresponding parameter. - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 39 Note: The number on the icon indicates the number of modifications in the list. Note: To know more about Inview S and Inview Slot operation, refer to the Inview manual and it is available on request. - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 40: Replacement Procedures

    5. The module will start up and take the first address available on the bus. Place the module & slide into the shelf Push firmly until module is engaged Make sure the latch is locked in the shelf - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 41: Controller - Inview Slot

    4. The controller begins to start up and read the parameters from modules in the live system. Place the module & slide into the shelf Push firmly until unit is engaged Make sure the latch is locked in the shelf - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 42: Controller - Inview S

    Fix it with four latches Fix the panel sheet with screws Connect wires and place the panel sheet in the cabinet Dimensions are in mm Panel sheet - cut-out details - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 43: Finishing

    • Cover empty inverter positions with dummy cover. • Make sure that the Remote ON/OFF is appropriately wired according to local regulations. • Make sure that the point of AC supply meets local regulations. - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 44: Commissioning

    Installation and commissioning must be done and conducted by trained people fully authorized to act on installation. It is prohibited to perform any isolation test without instruction from manufacturer. Equipments are not covered by warranty if procedures are not respected. - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 45: Check List

    Switch OFF AC input (commercial power failure) and check the alarm according to the configuration Switch OFF DC input (DC power failure) and check that the alarm according to the configuration Check the different digital input according to the configuration (when used) - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 46: Trouble Shooting And Defective Situations Fixing

    All OK but I have alarm: Check configuration file and correct No of modules Download/clear log file No output alarm: Mind the default time delay (UA: 60s, NUA: 30s) Check configuration file - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 47: Defective Modules

    Repair registering guidelines may be requested by email at tech.support@cetamerica.com. • The RMA number should be mentioned on all shipping documents related to the repair. • Be aware that products shipped back to CE+T Power without being registered first will not be treated with high priority.
  • Page 48: Maintenance

    • Validate input voltage (AC input, DC input, AC output) with multi-meter. • Replace dust filter. 12.3 Optional • With an infrared camera check termination hot spots. - Tighten terminations. - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 49: Service

    (*) CE+T will redirect your call to your vendor if he has such SLA in place. (**) Valid in USA and Canada only. (***) Messages that are not Major Incident or Emergency will be served at the next scheduled working day. - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 50: Appendix

    34.90 15.90 FRONT VIEW DETAIL B DETAIL A SCALE 1 : 2 SCALE 1 : 2 496.45 LEFT VIEW 26.50 226.50 TOP VIEW VIEW C ALL DIMENSIONS ARE IN mm - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 51: Connections And Wiring Diagrams

    2AWG 35MM2 DC+ DC- DC INPUT-1 48VDC 2* ------> AC OUTPUT L1 & L2 INTERLINK CONNECTION 3* ------> TO BE REMOVED WHEN EXTERNAL REMOTE USED Single phase - Wiring diagram - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 52: Single Phase (L-N) - Reg

    1* ------> REG MODE [MEN] CONNECTION B/W AC OUTPUT NEUTRAL AND EARTH 2* ------> AC OUTPUT L1 & L2 INTERLINK CONNECTION 3* ------> TO BE REMOVED WHEN EXTERNAL REMOTE USED Single phase - REG - Wiring diagram - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 53: Single Shelf - Split Phase (L1-L2-N)

    (4 MODULES INSTALLABLE) 10AWG 6MM2 6MM2 2AWG 35MM2 DC+ DC- DC INPUT-1 48VDC 3* ------> TO BE REMOVED WHEN EXTERNAL REMOTE USED Split phase - Single shelf - Wiring diagram - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 54: Single Shelf - Split Phase (L1-L2-N) - Reg

    1* ------> REG MODE [MEN] CONNECTION B/W AC OUTPUT NEUTRAL AND EARTH 3* ------> TO BE REMOVED WHEN EXTERNAL REMOTE USED Single shelf - Split phase - REG - Wiring diagram - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 55: Two Shelves - Split Phase (L1-L2-N)

    2* ------> AC INPUT/OUTPUT L1 & L2 INTERLINK CONNECTION 35MM2 DC+ DC- DC+ DC- 3* ------> TO BE REMOVED WHEN EXTERNAL REMOTE USED DC INPUT-1-2 48VDC Split phase - Wiring diagram - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 56: Two Shelves - Split Phase (L1-L2-N) - Reg

    2* ------> AC OUTPUT L1 & L2 INTERLINK CONNECTION 35MM2 DC+ DC- DC+ DC- 3* ------> TO BE REMOVED WHEN EXTERNAL REMOTE USED DC INPUT-1-2 48VDC Split phase - REG - Wiring diagram - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 57: Three Phase (L1-L2-L3-N)

    2* ------> AC INPUT/OUTPUT L1 & L2 INTERLINK CONNECTION 3* ------> TO BE REMOVED WHEN EXTERNAL REMOTE USED 2AWG 35MM2 DC+ DC- DC+ DC- DC INPUT-1-2-3 48VDC Three phase - Wiring diagram - Bravo 10 - 48/120 - User manual - v1.1...
  • Page 58: Three Phase (L1-L2-L3-N) - Reg

    2* ------> AC OUTPUT L1 & L2 INTERLINK CONNECTION 3* ------> TO BE REMOVED WHEN EXTERNAL REMOTE USED 2AWG 35MM2 DC+ DC- DC+ DC- DC INPUT-1-2-3 48VDC Three phase - REG - Wiring diagram - Bravo 10 - 48/120 - User manual - v1.1...

Table of Contents