Dual input inverter, the commercial power as default source, ac backup in a dc environment, leverage your existing dc infrastructure, one stop shop, wide output power range, harshest ac input conditions, without compromising the quality of the ac output, (51 pages)
Summary of Contents for CE+T Power BRAVO 10 - 48/120
Page 1
BRAVO 10 - 48/120 User Manual V1.1 BEYOND THE INVERTER THE NEW GENERATION OF POWER CONVERTERS • DUAL INPUT INVERTER Commercial Power as default source • AC BACKUP IN A DC ENVIRONMENT Leverage your existing DC infrastructure • ONE STOP SHOP Wide output power range •...
6.4.5 Three Phase Configuration - 208 Vac ................6.4.6 AC Input and Output ....................... 6.4.7 DC ..........................6.4.8 Bravo 10 System with Inview S - Connections ..............6.4.9 Signalling ........................- Bravo 10 - 48/120 - User manual - v1.1...
Page 3
14.2.1 Single phase (L-N) ......................14.2.2 Single phase (L-N) - REG ....................14.2.3 Single shelf - Split phase (L1-L2-N) ................14.2.4 Single shelf - Split phase (L1-L2-N) - REG ..............- Bravo 10 - 48/120 - User manual - v1.1...
Page 4
14.2.5 Two shelves - Split phase (L1-L2-N) ................14.2.6 Two shelves - Split phase (L1-L2-N) - REG ..............14.2.7 Three phase (L1-L2-L3-N) ....................14.2.8 Three phase (L1-L2-L3-N) - REG ..................- Bravo 10 - 48/120 - User manual - v1.1...
Page 5
Release Note: Release date Version Modified page number Modifications (DD/MM/YYYY) 07/02/2022 First release of the manual 09/09/2022 Updated the shelf connections - Bravo 10 - 48/120 - User manual - v1.1...
Introduction to CE+T 1. Introduction to CE+T CE+T Power designs, manufactures and markets a range of products for industrial operators with mission critical applications, who are not satisfied with existing AC backup systems performances, and related maintenance costs. Our product is an innovative AC backup solution that unlike most used UPS’s •...
• This product is suitable for use in a computer room. * These instructions are valid for most CE+T Products/Systems. Some points might however not be valid for the product described in this manual - Bravo 10 - 48/120 - User manual - v1.1...
• Remove weight from the cabinet by unplugging the inverters. Mark inverters clearly with shelf and position for correct rebuild. This is especially important in dual or three phase configurations. • Empty inverter positions should not be left open. Replace with blank module or cover. - Bravo 10 - 48/120 - User manual - v1.1...
1 Information and data given in this chapter is intended to serve as an overview of the ECI Technology. Detailed features and parameters for each individual module type in the range may differ and should be referred to in the dedicated data sheet. - Bravo 10 - 48/120 - User manual - v1.1...
Start, control and exit are fully automatic. The Walk-in mode where the transfer from DC source to AC source is ramped up within a fixed and adjustable period of time. - Bravo 10 - 48/120 - User manual - v1.1...
Material (casing) Zinc coated steel AC Input Data Nominal voltage (AC) / Current 120 Vac / 7.2 A Voltage range (AC) 95 - 140 Vac Brownout < 108 Vac linear decreasing - Bravo 10 - 48/120 - User manual - v1.1...
Page 14
300386 v1.9.1 / FCCpart 15 class A * Permanent 800 W / derating apply based on internal heatsink T°. ** Operation within lower voltage networks leads to de-rating of power performances. - Bravo 10 - 48/120 - User manual - v1.1...
So the Inview Slot controller should be placed only at the left side of the first slot in the shelf, while you are looking from the front. - Bravo 10 - 48/120 - User manual - v1.1...
Page 16
By default, Inview Slot works on 48 Vdc from battery/rectifier source. If DC is not present, it takes +12 V from external Auxiliary power supply converter (AC to DC). Shelf Rear Modbus (RS485) D1 D2 Power - Bravo 10 - 48/120 - User manual - v1.1...
• Power: The unregulated separate +12 V power supply is required for powering Inview S and this power should not be shared with other devices. (CET can provide Auxiliary Power Supply converter and the part number is T602004120). - Bravo 10 - 48/120 - User manual - v1.1...
• Generators supplying emergency AC to the building and to the converter should be sized at a minimum of two times the kVA rating of the converter. - Bravo 10 - 48/120 - User manual - v1.1...
7. Similarly, fix the other side of the shelf and insert modules in the corresponding slot. Hex socket screw Philips head screw Place the shelf in the cabinet and fix it Insert the modules in the shelf - Bravo 10 - 48/120 - User manual - v1.1...
1/4-20 inch Nut with torque 5.7 to 8.3 ft-lb. C : 0.56 K : 0.28 WIRE RANGE L : 1.06 Y : 0.70 Z : 0.28 N : 0.27 T : 0.09 All dimensions are in inch - Bravo 10 - 48/120 - User manual - v1.1...
Electrode Terminal Bravo 10 - 48/120 - Shelf Rear Details - REG (No AC Input) Note: In REG version, a copper plate is placed between PE and Neutral. Also, ground should be connected to Grounding electrode terminal using 10-24 inch nut of torque 3.2 to 4.8 ft-lb.
AC IN DC + DC - 6.4.3.1 Single phase configurations with Inview Slot and S Single phase with Inview Slot - 4 kVA Single phase with Inview S - 5 KVA - Bravo 10 - 48/120 - User manual - v1.1...
Split phase with Inview Slot - 4 kVA Phase 1 Phase 2 Used Split phase with Inview Slot - 8 kVA Phase 1 Phase 2 Split phase with Inview S - 10 kVA - Bravo 10 - 48/120 - User manual - v1.1...
Phase 1 Phase 2 Used Phase 3 Used Three phase with Inview Slot - 12 kVA Phase 1 Phase 2 Phase 3 Three phase with Inview S - 15 kVA - Bravo 10 - 48/120 - User manual - v1.1...
15 kVA / 12 kW 42 A 60 A 4 AWG (L1-L2-L3-N) * One conductor / pole - 90°C Note: The Icc value measured as 60 Arms per shelf with five modules. - Bravo 10 - 48/120 - User manual - v1.1...
Page 26
For each shelf, the DC breaker should be a separate branch protection (MCB) to distribute the DC. • The Inner hole diameter of the DC lug (two holes) should be 1/4”, and it is recommended to use only the supplied screws. - Bravo 10 - 48/120 - User manual - v1.1...
• The remote ON/OFF switch the output AC OFF. • Input AC and input DC is not affected by the remote ON/OFF. - Bravo 10 - 48/120 - User manual - v1.1...
Page 28
CAN bus cables. • The internal bus connectors are sensitive and special caution should be taken during installation to keep them out of harms way. - Bravo 10 - 48/120 - User manual - v1.1...
Three LED’s are present behind the front black plastic of the controller to indicate major alarm, minor alarm, and system status. These LED’s are not visible until they illuminate during the corresponding action occurs. Front black plastic (Red) Major alarm (Orange) Minor alarm (Green) System status - Bravo 10 - 48/120 - User manual - v1.1...
• Battery • Active power • Time power (kW) • Apparent • DC Power (kVA) • Module • Apparent configured Power (kVA) • System status - OK, OFF, AL and NT/KO - Bravo 10 - 48/120 - User manual - v1.1...
Alarms and Logs 7.3.1 LED indications Three LED’s are present at front side of the controller to indicate major alarm, minor alarm, and system status. Major Alarm Minor Alarm System Status - Bravo 10 - 48/120 - User manual - v1.1...
• Configured modules • Apparent power • Load current • Frequency • Configured modules • Redundancy status • Power factor • Load power • Module status • Installed power • Battery temperature - Bravo 10 - 48/120 - User manual - v1.1...
Note: If any parameter is changed, an authentication page appears. Enter the display PIN password to apply changes. Cutoff alarms Buzzer sound will be muted Logs Display the latest 100 events occurred. Information Displays product and network details - Bravo 10 - 48/120 - User manual - v1.1...
An auto-logout feature is available to avoid a user being connected all the time. When no action is performed for more than 10 minutes, the session will expire and goes to login screen. 7.5.2 Interface Areas 1 Header 2 Main Page - Bravo 10 - 48/120 - User manual - v1.1...
Page 37
5 S ystem Information: Displays system information such as Converter System, DC System, Site, Energy system, Sensors and Actuators details. (Note: System information screen varies depending upon the topology selection.) - Bravo 10 - 48/120 - User manual - v1.1...
Page or section collapse Particular section opens in a new tab Particular section open as a pop-up Drop down list – more options are present Delete / Clear the corresponding parameter. - Bravo 10 - 48/120 - User manual - v1.1...
Page 39
Note: The number on the icon indicates the number of modifications in the list. Note: To know more about Inview S and Inview Slot operation, refer to the Inview manual and it is available on request. - Bravo 10 - 48/120 - User manual - v1.1...
5. The module will start up and take the first address available on the bus. Place the module & slide into the shelf Push firmly until module is engaged Make sure the latch is locked in the shelf - Bravo 10 - 48/120 - User manual - v1.1...
4. The controller begins to start up and read the parameters from modules in the live system. Place the module & slide into the shelf Push firmly until unit is engaged Make sure the latch is locked in the shelf - Bravo 10 - 48/120 - User manual - v1.1...
Fix it with four latches Fix the panel sheet with screws Connect wires and place the panel sheet in the cabinet Dimensions are in mm Panel sheet - cut-out details - Bravo 10 - 48/120 - User manual - v1.1...
• Cover empty inverter positions with dummy cover. • Make sure that the Remote ON/OFF is appropriately wired according to local regulations. • Make sure that the point of AC supply meets local regulations. - Bravo 10 - 48/120 - User manual - v1.1...
Installation and commissioning must be done and conducted by trained people fully authorized to act on installation. It is prohibited to perform any isolation test without instruction from manufacturer. Equipments are not covered by warranty if procedures are not respected. - Bravo 10 - 48/120 - User manual - v1.1...
Switch OFF AC input (commercial power failure) and check the alarm according to the configuration Switch OFF DC input (DC power failure) and check that the alarm according to the configuration Check the different digital input according to the configuration (when used) - Bravo 10 - 48/120 - User manual - v1.1...
All OK but I have alarm: Check configuration file and correct No of modules Download/clear log file No output alarm: Mind the default time delay (UA: 60s, NUA: 30s) Check configuration file - Bravo 10 - 48/120 - User manual - v1.1...
Repair registering guidelines may be requested by email at tech.support@cetamerica.com. • The RMA number should be mentioned on all shipping documents related to the repair. • Be aware that products shipped back to CE+T Power without being registered first will not be treated with high priority.
• Validate input voltage (AC input, DC input, AC output) with multi-meter. • Replace dust filter. 12.3 Optional • With an infrared camera check termination hot spots. - Tighten terminations. - Bravo 10 - 48/120 - User manual - v1.1...
(*) CE+T will redirect your call to your vendor if he has such SLA in place. (**) Valid in USA and Canada only. (***) Messages that are not Major Incident or Emergency will be served at the next scheduled working day. - Bravo 10 - 48/120 - User manual - v1.1...
34.90 15.90 FRONT VIEW DETAIL B DETAIL A SCALE 1 : 2 SCALE 1 : 2 496.45 LEFT VIEW 26.50 226.50 TOP VIEW VIEW C ALL DIMENSIONS ARE IN mm - Bravo 10 - 48/120 - User manual - v1.1...
2AWG 35MM2 DC+ DC- DC INPUT-1 48VDC 2* ------> AC OUTPUT L1 & L2 INTERLINK CONNECTION 3* ------> TO BE REMOVED WHEN EXTERNAL REMOTE USED Single phase - Wiring diagram - Bravo 10 - 48/120 - User manual - v1.1...