Changeability Of This Document; Associated Literature; Conditioned Based Maintenance - Johnson Controls YORK YVAM 0350 Operation & Maintenance Manual

Centrifugal liquid chiller with r-134a refrigerant
Table of Contents

Advertisement

External wiring, unless specified as an optional connection in the manufacturer's product line, is not
to be connected inside the control cabinet. Devices such as relays, switches, transducers and controls
and any external wiring must not be installed inside the micro panel. All wiring must be in accordance
with Johnson Controls' published specifications and must be performed only by a qualified electrician.
Johnson Controls will NOT be responsible for damage/problems resulting from improper connections
to the controls or application of improper control signals. Failure to follow this warning will void the
manufacturer's warranty and cause serious damage to property or personal injury.

Changeability of this document

In complying with Johnson Controls' policy for continuous product improvement, the information
contained in this document is subject to change without notice. Johnson Controls makes no
commitment to update or provide current information automatically to the manual owner. Updated
manuals, if applicable, can be obtained by contacting the nearest Johnson Controls Service office or
accessing the Johnson Controls Knowledge Exchange website at
chillers/.
Operating/service personnel maintain responsibility for the applicability of these documents to the
equipment. If there is any question regarding the applicability of these documents, the technician
should verify whether the equipment has been modified and if current literature is available from
the owner of the equipment prior to performing any work on the chiller.

Associated literature

Table 1: Associated literature
Manual description
Installation and Reassembly
Unit Installation Checklist and Request for Startup
Unit Startup Checklist
Field Connections Diagram
Field Control, Wiring, and MBC Diagrams
Centrifugal Chiller Long Term Storage
All Products - Replacement Parts Electrical Connectors
All Products - Replacement Parts Fittings

Conditioned based maintenance

Traditional chiller maintenance is based upon assumed and generalized conditions. In lieu of
the traditional maintenance program, a Johnson Controls YORK Conditioned Based Maintenance
(CBM) program can be substituted. This CBM service plan is built around the specific needs for
the chiller, operating conditions, and annualized impact realized by the chiller. Your local Johnson
Controls Branch can propose a customized Planned Service Agreement that leverages real time
and historical data, delivering performance reporting, corrective actions required and data enabled
guidance for optimal operation and life cycle assurance. The program will include fault detection
diagnostics, operation code statistics, performance based algorithms and advance rules based
rationale delivered by the Johnson Controls Connected Equipment Portal.
8
WARNING
https://docs.johnsoncontrols.com/
Form number
160.88-N1
160.88-CL1
160.88-CL2
160.88-PW1
160.88-PW2
50.20-NM5
50.20-RP1
50.20-RP2
YVAM Control Center

Advertisement

Table of Contents
loading

Table of Contents