Installation

You can mount the iSTAR Ultra G2 enclosure directly to a wall or uni-strut using suitable user-supplied hardware. Alternatively,
you can mount the iSTAR Ultra G2 GCM and ACM in a standard 19-inch rack system.
The system must be installed indoors within a protected premises in accordance with the National Electrical Code (NFPA70), and
NOTE
relevant local authority regulations. Observe static electricity precautions when unpacking components.

Installing on a Wall

1. Ensure that the mounting site has been prepared. A certified installer or structural engineer should verify the upper
mounting points can sustain a 75 lb (34 kg) load.
2. Remove the appropriate knockouts on the enclosure for the wiring inputs and outputs.
3. Remove the enclosure door. Place it on a soft surface to avoid scratching it.
4. Align the keyhole mounting slots at the upper back of the enclosure with the two upper mounting screws and lower the
enclosure into position. Tighten the mounting screws. See
5. Install x3 bottom mounting screws and tighten.
6. Attach conduit couplings to the knockout openings as needed to comply with local and national codes or regulations.
7. Reattach the enclosure door.
• If an accessory board is mounted to the inside of the door, ensure the wires are not pinched by the door.
Installing in a Rack System
1. Ensure there is adequate air flow keeping the ambient temperature below 120°f/49°c in the rack system.
2. Mount the unit with either 10/32 or 10/24 hardware.
3. Route the GCM and ACM cabling through rack cable management system and label for convenience.
4. Connect Ethernet cabling, as required, to the Ethernet port(s).
5. Secure the power inputs with zip-ties.
iSTAR Ultra G2 Controller Installation and Configuration Guide