Power Supply; Installation Tools; Installation Accessories; Pre-Installation Checklist - H3C SecPathT5030 Installation Manual

Intrusion prevention system
Table of Contents

Advertisement

IMPORTANT:
No network port lightning arrester or AC power lightning arrester is provided with the device. Prepare
them as required. For the technical specifications and installation instructions for the lightning
protectors, see the documents shipped with them.

Power supply

Verify that the power system at the installation site meets the requirements of the power supplies,
including the input method and rated input voltage. For more information, see power supply
specifications in "Appendix A Chassis views and technical specifications."

Installation tools

No installation tools are provided with the device. Prepare installation tools yourself as required.
Table 5 Installation tools
Flathead screwdriver
Diagonal pliers

Installation accessories

Table 6 Installation accessories
M6 rack screw
Slide rails and
chassis rails

Pre-installation checklist

Table 7 Pre-installation checklist
Item
Installation
Phillips screwdriver
ESD wrist strap
M4 mounting bracket screw
Mounting brackets each
attached with a cable
management bracket
Requirements
Ventilation
Needle-nose pliers
Wire-stripping pliers
Cage nut
Console cable
There is a minimum clearance of 100 mm (3.94 in) around the inlet
and outlet air vents of the chassis for heat dissipation.
6
Marker
Crimping tool
Grounding cable

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SecPathT5030 and is the answer not in the manual?

This manual is also suitable for:

Secpatht5060Secpatht5080Secpatht5000-sSecpatht5000-c

Table of Contents