IMPORTANT:
No network port lightning arrester or AC power lightning arrester is provided with the device. Prepare
them as required. For the technical specifications and installation instructions for the lightning
protectors, see the documents shipped with them.
Power supply
Verify that the power system at the installation site meets the requirements of the power supplies,
including the input method and rated input voltage. For more information, see power supply
specifications in "Appendix A Chassis views and technical specifications."
Installation tools
No installation tools are provided with the device. Prepare installation tools yourself as required.
Table 5 Installation tools
Flathead screwdriver
Diagonal pliers
Installation accessories
Table 6 Installation accessories
M6 rack screw
Slide rails and
chassis rails
Pre-installation checklist
Table 7 Pre-installation checklist
Item
Installation
Phillips screwdriver
ESD wrist strap
M4 mounting bracket screw
Mounting brackets each
attached with a cable
management bracket
Requirements
•
Ventilation
Needle-nose pliers
Wire-stripping pliers
Cage nut
Console cable
There is a minimum clearance of 100 mm (3.94 in) around the inlet
and outlet air vents of the chassis for heat dissipation.
6
Marker
Crimping tool
Grounding cable
Need help?
Do you have a question about the SecPathT5030 and is the answer not in the manual?