Mafell ZSX Ec 260 HM Operating/Safety Instructions Manual page 16

Table of Contents

Advertisement

Available languages

Available languages

21. Close the guard sheet (16) at the bottom of
the guide bar.
22. Using the combination screwdriver (B), turn
the hexagon socket screw (15) clockwise to
tighten it.
23. Insert the cover and close it.
24. Insert the fillister head screw (10). Using the
combination screwdriver (B), turn it clockwise
to tighten it.
25. Close the spring-loaded lower protection flap
(11) upward.
The saw chain is changed.
A new saw chain must be run in at idle speed for approx. 2 to 3 minutes after it has been
mounted. Ensure that there is sufficient chain lubrication during this process. After this
initial run-in, it may be necessary to correct the chain tension.
16
Fig. 11: Closing the guard sheet at the guide bar
Fig. 12: Inserting the cover
Fig. 13: Closing the protective flap
ZSX Ec
02/2022

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zsx ec 400 hmZsx ec 400 q

Table of Contents