Page 1
20mm Stables B20-MD-019 Please read these instructions fully before starting construction. PVA or equivalent glue will be required to stick sections together. Sand paper can be used to gently clean any joints. A sharp modelling knife will be required to remove sections from the sprue. Please use knives with due care and remember to cut away from yourself at all times.
Page 2
Take the frames shown above. Starting with the The door and the upper / lower supports. doorway, glue the frames into position. They will align on the left and extend out by around 3mm on the right. Glue the lower support into the doorway as Place the top support on top of the door and shown above.
Page 3
Attach the roof plate. Add the frame pieces to each end of the roof. Glue the desired stable doors into place. Add the insert pieces. Painting It is much easier to paint the insert sections of this building prior to assembly. They were left on the sprue and sprayed white using a car undercoat spray.
Need help?
Do you have a question about the B20-MD-019 and is the answer not in the manual?
Questions and answers