Page 1
Bridge Assembly B20-DIDG-xxx Please read these instructions fully before starting construction. PVA or equivalent glue will be required to stick sections together. Sand paper can be used to gently clean any joints. A sharp modelling knife will be required to remove sections from the sprue. Please use knives with due care and remember to cut away from yourself at all times.
Page 2
An example of the bridge in use on a pair of If you are building a “damaged” bridge ensure the embankment (EMB-035) tiles. damage on each of the pieces that are to be glued back-to-back match up. If the bridge is to be used with EMB sections that have rounded edges rather than square ones, additional pieces have been included in the kit to fill in this space.
Page 3
Flat Bridges for use with EMB tiles These can be built with either a brick/stone parapet or a fence. If you are building a brick/stone bridge - start by Glue the inner walls to the roadway as shown. Note – removing the roadway and inner wall pieces from the etched detail on the inner walls should face the sprue.
Page 4
Take the wooden support sections. Glue them to the underside of the roadway with the etched detail facing outwards. Multi-part flat bridges: As with the arched bridges, each end of a flat A flat centre section showing the lugs at each end. multi-part bridge has a lug at one end to slot into a support column.
Page 5
Attach the other end/side. Add the top piece being sure not to get glue around the holes. Some of the different size/shape columns provided with the bridge kits.
Need help?
Do you have a question about the B20-DIDG Series and is the answer not in the manual?
Questions and answers