Page 7
We stand behind the quality and dependability of every product with an industry leading Beneficial Use warranty. If you are not satisfied with a Vicon product or service, I would like to know. Your complete satisfaction is the mission of every Vicon employee.
Assembling the Side Support Brackets to the EIA Rack............... 5 Assembling the Monitor/Baseplate to the Side Supports..............5 Assembling the Monitor Bezel to the Rack Mount................6 Maintenance ............................6 Shipping Instructions........................7 Contents • • i X517 Rev 798 Monitor Rack-Mounting Kits...
Page 12
List of Figures Figure 1 Exploded View of Monitor Rack......................1 Figure 2 Baseplate Locking Screw ........................5 ii • • List of Figures X517 Rev 798 Monitor Rack-Mounting Kits...
Read these instructions through completely before attempting installation. The Vicon Monitor Rack-Mounting Kits are designed to permit mounting Vicon video monitors in an EIA standard 19-inch equipment rack. Figure 1 Exploded View of Monitor Rack Introduction •...
Installation Unpacking and Inspection All Vicon equipment is tested and inspected before leaving the factory. It is the carrier’s responsibility to deliver the equipment in the same condition as it left the factory. Inspection For Visible Damage Immediately inspect the cartons upon delivery. Make a note of any visible damage on all copies of the carrier’s freight bill.
Install the baseplate to the monitor bottom by aligning the holes in the baseplate with the five holes in the monitor bottom and secure it with the five sheet metal screws provided in the accessory kit. 6. Turn the assembly right side up. 4 • • Installation X517 Rev 798 Monitor Rack-Mounting Kits...
3. The remaining two self-tapping screws are inserted through the front flange of the baseplate. The front flange of the baseplate has the word FRONT stamped into it. Figure 2 Baseplate Locking Screw Installation • • 5 X517 Rev 798 Monitor Rack-Mounting Kits...
4. Complete all cable and power cord connections to the monitor. This completes installation. Maintenance The Vicon monitor rack mount kits require no scheduled maintenance. The front bezel may be dusted with a soft cloth as needed. 6 • •...
Shipping Instructions Use the following procedure when returning a unit to the factory: 1. Call or write Vicon for a Return Authorization (R.A.) at one of the locations listed below. Record the name of the Vicon employee who issued the R.A.
Need help?
Do you have a question about the X517 and is the answer not in the manual?
Questions and answers