Frame Relay Cabling; T1 Cabling; Table B-3 Rj-48C T1/E1 Connector Pin Assignments - Cisco MGX 8230 Installation And Configuration Manual

Cisco systems edge concentrator installation and configuration guide
Table of Contents

Advertisement

Frame Relay Cabling

Frame Relay Cabling

T1 Cabling

Trunk cables connect the customer DSX-1 cross-connect point or T1 Channel Service Unit (CSU) to the
MGX 8230 at the T1 back card. See to
Cable Parameter
Cable Type
Cable Connector
Max. Cable Length
Table B-3
Pin No.
1
2
3
4
5
6
Transmit direction is toward the T1 trunk.
Note
Cisco MGX 8230 Edge Concentrator Installation and Configuration
B-2
Description
Western Electric 22 AWG, ABAM individually shielded twisted
pair
(100 ohm balanced). Two pair per T1 line (1 transmit and 1 receive).
RJ-48C male.
655 ft. (199.664 m) maximum between the MGX 8230 node and the
first repeater or CSU. Selection of cable length equalizers.
RJ-48C T1/E1 Connector Pin Assignments
Description
Transmit Tip
Transmit Ring
Transmit Shield
Receive Tip
Receive Ring
Receive Shield
Figure B-1
and
Table B-3
(Figure B-1
illustrates the RJ-48 connector pin out.)
Release 1.1.31, Part Number 78-11215-03 Rev. B0, May 2001
Appendix B
Cable Specifications
for details.

Advertisement

Table of Contents
loading

Table of Contents