Download Print this page

Installation Options - Feit Electric SHOP/4/840/MM Use And Care Manual

Shop light with motion and remote

Advertisement

Chain and V-Hook Installation
1
Turning off the power
□ Turn the power OFF at the switch,
fusebox, or the circuit breaker.
2
Attaching hanging hooks
□ Attach two hanging hooks (GG) to the ceiling. The spacing
between the hanging hooks should be 46 in. If the ceiling
is concrete or drywall, drill two holes and insert two
anchors (EE).
3
Installing the chain to V-hooks
□ Attach the chain (AA) to the V-hooks (BB)
then insert the hooks into the mounting holes
located on the top of the fixture. Do this for
both ends of the fixture.
AA
BB
46 in.
Ceiling
EE
GG
4
Attaching the hanging chain
□ Hang the hanging chain (AA) onto the hanging hooks (GG)
and plug in the power cord to the outlet.
GG
5
Attaching the zip tie
□ Use the zip tie (CC) to attach the cord to the hanging
chain (AA).
6
Turning on the power
□ Turn the power ON at the switch, fusebox, or the circuit breaker.
□ Turn the fixture ON/OFF using the provided remote.
7
Linking multiple shoplights (optional)
□ Link up to six.
4
Ceiling
AA
Ceiling
AA
CC

Advertisement

loading