Installation
1
Be sure the power cable is not connected to a power outlet and
make an electrical connection between the top light (AA)
and the telescoping post (BB).
AA
BB
2
Slide the telescoping post (BB) into the top light (AA)
until you hear a solid click.
3
Slide the other end of the telescoping post (BB) into the base (DD)
and insert the screw (CC) to lock it into position.
DD
4
Set-up / stack the trays on top of the base depending on the
desired ways to grow.
EE
FF
GG
4
Please contact 1-866-326-BULB (2852) for further assistance.
BB
CC
WWW.FEIT.COM