Download Print this page

Feit Electric SHOP/4/840/MM Use And Care Manual page 5

Shop light with motion and remote

Advertisement

Fixture Flush Mount Screw Installation
1
Turning off the power
□ Turn the power OFF at the switch, fusebox, or the circuit breaker.
2
Attaching the anchors and screws
□ Using the provided mounting template (LL), drill two holes 44 in. apart. Be sure to offset the right hole (or opposite side) by 5/8 in.
□ If the ceiling is concrete or drywall, drill two holes and insert two anchors (EE).
DD
D 0.079 – 0.099 in.
3
Securing the fixture
□ Lift the fixture (FF) up to the mounting screws (DD) fitting into place thru large openings. The fixture should be firmly fixed
against the mounting screws (DD). Push the fixture forward or backward to lock in place. Plug in the power cord to the outlet.
4
Turning on the power
□ Turn the power ON at the switch, fusebox, or the circuit breaker.
□ Turn the fixture ON/OFF using the provided remote.
5
Linking multiple shoplights (optional)
□ Link up to six.
44 in.
EE
Ceiling
5
Please contact 1-866-326-BULB (2852) for further assistance.
5/8 in.
offset
offset this
DD
screw by
5/8 in.
FEIT.COM

Advertisement

loading