Section 3: INSTALLATION
Mount the Control unit using the (2) holes located on each side of the box. The figure below shows the center to center
mounting distances required.
Connect the main air supply to the inlet of the control unit as shown below. Connect the air hose to the applicator from
the outlet of the control unit. Appropriately tighten each fitting. Connect the female cable connector to the male
connector on the control unit.
Male Cable Connection
MOUNTING THE CONTROL UNIT
I/O CONNECTIONS
Bottom View
AH-10-01 : Vector Solo SPM
11
100 mm
Main Air Into Control Unit
Air Out to Applicator