Download Print this page

Bolt (1/4 X 5/8 Inch) - Toro 132-9543 Installation Instructions Manual

Console kit for greensmaster 3320 or 3420 series triflex traction unit

Advertisement

Installing the Neutral-Lock Cable
1. Remove the original cable and route the new cable in
its place.
2. Connect the neutral-lock cable to the pedal shifter
(Figure
24).
Figure 24
1. Neutral-lock cable
3. Connect the neutral-lock cable to the cable connector
(Figure
25).
Figure 25

1. Bolt (1/4 x 5/8 inch)

2. Cable clamp
3. Retainer nut
4. Install the retainer nut onto the console assembly
(Figure
25).
5. Use the 2 bolts (1/4 x 5/8 inch) to secure the cable with
the cable clamp to the console assembly
6. Secure the cable to the machine with cable ties.
2. Ball-joint connector
4. Cable
5. Cable connector
(Figure
25).
Installing the Switches and Indicators
1. Press hour meter into the cutout until it is secure with
the retainer
(Figure
1. Hour meter
2. Retainer
2. Use the retaining ring to secure the audio alarm to the
console assembly
1. Audio alarm
3. Use the retaining ring to secure the display to the
console assemble
10
26).
Figure 26
Cutaway View
3. Cutaway
(Figure
27).
Figure 27
2. Retaining ring
(Figure
28).

Advertisement

loading