Installing the NPE-G1 or NPE-G2
Figure 7-29
3
1
Power switch
2
Power receptacle
3
Captive installation screw
4
M5 grounding receptacles
5
M5 grounding lug
Step 3
SIf necessary, use a wire stripper to strip approximately 0.55 inch (14 mm) from the –V, +V, and ground
leads.
The ground lead for the Cisco uBR7200 series DC-input power supply consists of a two-hole grounding
Note
lug that connects to an M5 grounding receptacle; you do not need to strip this ground lead.
Figure 7-30
1
0.55 in. (14 mm)
Network Processing Engine and Network Services Engine Installation and Configuration
7-42
Connecting DC-Input Power to a Cisco uBR7246VXR Router
4
5
Stripping the DC-Input Lines
1
Chapter 7
NPE-G1 and NPE-G2 Installation and Configuration Information
2
1
7
8
6
6
–V lead
7
M4 studs
8
+V lead
9
Handle
9
OL-4448-12