VRA51701-R.3607.A
* Rewrite IR pass filter compensation data
When the main PCB or parts of optical system are replaced, rewrite the compensation data according to the following
instrucition.
① After replacing parts, perform "IR Leakage Test" (IR pass filter) from page A22 to A23. Record each data on inspection
results (Leak_g・Leak_s・Leak_k).
② Select "Run" on the main menu, then choose "IR Leakage Intensity" and "Write" from the pulldown menus.
③ Input each data (Leak_g・Leak_s・Leak_k) that was recorded in ① , then click "OK".
- A45 ・
-
LS-9000