DOCUMENT # 90020, REV 5 MODEL 7000 GYRO INSTALLATION MANUAL-MAR09
Unpacking Crate –
1) Reference Seakeeper Drawing No. 90001, Model 7000 Hardware Scope Of Supply for items that
ship with the gyro.
2) Remove electrical components, cables, and misc. items and set aside.
3) Remove "tray" and packing materials that secure gyro assembly inside the crate.
4) Attach spreader bar to the two lifting eyes located on the top of the gyro enclosure. Also attach a
leveling line that connects spreader bar to top end of brake cylinder structure. See Fig 3
below.
INSTALLATION OF GYRO-
1) Position Gyro near foundation.
2) Perform dry fit of gyro assembly over hull structure (no adhesive) to confirm that fit is good.
3) Confirm adhesive gap is within adhesive manufacturer's requirements.
4) Raise gyro clear of foundation and thoroughly clean inside surfaces of gyro foundation saddles
with the appropriate solvent required by adhesive as shown in Figure 5 below.
FIGURE 3 – LIFTING ARRANGEMENT
Page 8 of 9
Need help?
Do you have a question about the 7000 and is the answer not in the manual?