Operation And Fitting Instructions; Operating Conditions; Wall Mounting - Nibe DRAZICE TO - 20.1 Operating And Installation Manual

Table of Contents

Advertisement

2 OPERATION AND FITTING INSTRUCTIONS

2.1

OPERATING CONDITIONS

The tank shall only be used in accordance with the conditions specified on the performance plate
and in instructions for electric wiring. Besides legally acknowledged national regulations
and standards, also conditions for connection defined in local electric and water works have to
be adhered to, as well as the installation and operation manual. The room, in which
the appliance will be operated, must be frost-free. The appliance has to be mounted
at a convenient place, it means that the appliance must be easily available for potential
necessary maintenance, repair or replacement, as the case may be.
If water is strongly calcareous we recommend that any of the common decalcifying devices was
installed with the appliance, or that the thermostat was set to the minimum operating
temperature of 55 °C (setting to position „OPTIMUM"). For proper operation, drinkable water
of adequate quality shall be used. To avoid potential sediments, we recommend that the device
was installed together with a water filter.
2.2

WALL MOUNTING

Prior to the mounting, check the bearing capacity of the wall and the material it is made of,
considering the weight of the heater filled with water. Depending on the wall material, choose
adequate fixtures. We recommend entrusting wall mounting and anchoring to a specialist
company or discussing the anchorage with an expert.
Figure 2
TO 20.1
A
585
B
254
D
516
E
357
H
247
K
103
R
180
1/2" outer
- 6 -

Advertisement

Table of Contents
loading

Table of Contents