Simplex 4100-5101 Installation Instructions Manual page 10

Xps and xnac
Table of Contents

Advertisement

Step 3. Internal Wiring,
Power Distribution
The power distribution module (PDM) connects to the SPS, RPS, or XPS in each bay. One PDM
Module
is used per back box. Use the instructions below to properly connect the PDM to each bay.
Connections
1. Route the black and white AC power wires to the supplied ferrite bead. Loop the wires
twice through the bead as shown in Figure 5.
2. Wire 120/220/230/240 VAC to the PDM, keeping AC wires at least 1 inch away from all
other wires. AC power must stay in the right side of the cabinet, in the non-power-limited
area.
3. Connect batteries to P5 on the PDM using Harness 734-015.
Continued
TO AC BREAKER
Figure 5. Loop wires through bead as shown
10
firealarmresources.com
TO PDM
Continued on next page

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 4100-5101 and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

4100-51024100-51034100-5115

Table of Contents