Install Light Tower - Graco 24N816 Instructions Manual

Level detection module and drum feed kit
Table of Contents

Advertisement

Install Light Tower

NOTE: Install the light tower in a suitable location for
clear viewing.
1. Create the hole pattern below to match the light
tower base.
Mount Pattern
2. Use the provided screws to attach the light tower to
the mounting bracket.
3. Route the light tower cord as needed towards the
ADM.
NOTICE
To prevent damage to the cord, ensure it will not be
pinched during normal machine operation after
routing.
4. Connect the cable to the port labeled "1" on the
base of the ADM. Refer to F
NOTE: A 5 m (16 ft) cable is provided with the level con-
trol kit. If extension cables are necessary, refer to GCA
CAN Cables - Reference manual.
3A2806A
Ø 1.57
Bolt Circle
Ø 0.90
3x 8-32 UNC 2B
Equally Spaced
. 1, page 4.
IG
Installation
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

24n767

Table of Contents