Installation And Safety Considerations; Installing Multiple Switches; Electrical Considerations; Environmental Considerations - HP StorageWorks T5527A User Manual

Switch for hp bladesystem c-class
Table of Contents

Advertisement

Installation and safety considerations

The 8Gb SAN Switch installs in the I/O bays in the rear of the HP BladeSystem c-Class enclosure. Refer to
the appropriate BladeSystem Enclosure Setup and Installation Guide for specific enclosure requirements.

Installing multiple switches

If you do not have a DHCP server connected to the OA, install and configure one 8Gb SAN Switch at a
time. This is required so that Ethernet IP address conflicts do not occur with duplicate default Ethernet IP
addresses.
IMPORTANT:
DHCP is enabled by default on this switch. In cases where DHCP is available, IP address conflicts will not
occur, simplifying multiple switch installations. See
Each switch must be assigned a unique Ethernet IP address during configuration. Once the default
Ethernet IP address on the 8Gb SAN Switch has been changed, you may install additional 8Gb SAN
Switches in the enclosure.
See the appropriate HP BladeSystem Enclosure Setup and Installation Guide for help identifying your
specific enclosure setup, available connections, and power requirements.

Electrical considerations

The 8Gb SAN Switch requires 35 watts, provided by the enclosure. No other power requirement or
provision exists.

Environmental considerations

Ensure proper cooling and ventilation by verifying the following:
The air vents on the enclosure are not blocked or restricted.
The ambient air temperature at the front of the enclosure does not exceed 35°C (95°F) while the
switch is operating.
IMPORTANT:
The dust covers that ship with your 8Gb SAN Switch
not installed, to help contain air flow in the BladeSystem chassis.

Install the 8Gb SAN Switch

Install the Brocade 8Gb SAN Switch into the enclosure:
1.
Locate the appropriate interconnect bay in the rear of the enclosure as specified in the appropriate
HP BladeSystem Enclosure Setup and Installation Guide provided with your enclosure.
IMPORTANT:
Populate all enclosure I/O bays with the appropriate component (for example a switch,
Pass-Thru, or one of the blank panels provided with the enclosure).
20
Setup
Using external
DHCP, page 24.
must
be inserted into any ports where SFPs are

Advertisement

Table of Contents
loading

This manual is also suitable for:

Brocade 8gb san

Table of Contents