D. Non-Combustible Material Installation
WARNING! Risk of Fire! DO NOT remove factory-
installed non-combustible material.
This model ships with the required top, left and right non-
combustible board. The top non-combustible board has
been pre-installed at the factory with three screws. The left
and right side non-combustible boards are shipped inside
the appliance. See Figure 6.5.
1. Remove the left and right non-combustible components
from the shipping position and set aside.
2. Pivot the lower cover panel down by lifting the lower
cover panel "up" and rotating the top downward.
3. Locate the manual bag assembly and remove the small
package containing the 1-1/2 inch Phillips screws.
Note: Care should be taken when installing screws into
the non-combustible board. DO NOT overtighten screws.
Screws should be set "flush" to the surface of the non-
combustible board.
4. Further secure the top non-combustible board by
installing screws into the pilot holes located in the upper
left and right corners of the top non-combustible board
as shown in Figure 6.6.
5. Install the left and right non-combustible components
with four of the provided Phillips screws. See Figure 6.6.
After all non-combustible material has been installed,
remove the small package of sheet metal screws from
the manual bag. Reinstall lower cover panel and ensure
it is "hooked" onto the appliance. Use the two screws
from the package to fasten the top sides of the cover
panel to appliance. The holes on the cover panel should
align with the holes in the sides of the appliance. See
Figure 6.5.
6. Install drywall screws (not provided) around the
perimeter of the installed non-combustible components
to secure it to the framing material. Refer to Section 10
for more information.
40
Hearth & Home Technologies • DVLINEAR36 Installation Manual • 2569-980 Rev. E • 11/20
COVER PANEL
SCREW LOCATIONS
Figure 6.5 Shipping Position - Non-Combustible Sides
INSTALL TWO OF THE
PROVIDED SCREWS INTO
THESE PILOT HOLES
Figure 6.6 Installation of the Side Non-Combustible Components
INSTALL FOUR
OF THE PROVIDED
SCREWS INTO
THESE PILOT HOLES
NOTE: BOTH LEFT &
RIGHT SIDES

Advertisement