PCB Construction

This section discusses the construction of the EVM boards. It includes the board schematics and layout files to show how the board was built.
6.1

TUSB1002 EVM Board Schematics

Figure 3
and
Figure 4
illustrate the EVM schematics.
VBUS
P1
1
VBUS
USB2_DM
2
USB2_DM
3
USB2_DP
USB2_DP
4
GND
9
SS_RX_P
8
SS_RX_N
10
7
Shield1
GND_DRAIN
11
6
TX1P_Conn
Shield2
SS_TX_P
TX1N_Conn
5
SS_TX_N
USB3.0 Type B Receptacle
VBUS
C5
10uF
SLLU245 – May 2016
Submit Documentation Feedback
CH2_EQ1
CH2_EQ2
VBUS
USB2_DM
USB2_DP
RX2P
RX2N
C1
0.1uF
TX1P
TX1N
C2
0.1uF
RSVD1
RSVD1
CH1_EQ1
CH1_EQ2
U2
1
5
3.3V
VIN
VOUT
2
C6
GND
C7
1uf
3
4
10uF
EN
N/C
LP5907
Figure 3. TUSB1002 EVM Schematic (High Speed Pins and Power)
Copyright © 2016, Texas Instruments Incorporated
CH2_EQ1
CFG2
CFG2
CH2_EQ2
SLP_S0#
SLP_S0#
VCC_3.3V
U1
19
12
TX2P
RX2P
TX2P
20
11
TX2N
RX2N
TX2N
21
10
GND
GND
TUSB1002RGE
22
9
TX1P
RX1P
23
8
TX1N
RX1N
24
7
MODE
RSVD1
MODE
25
PAD
VCC_3.3V
EN
CFG1
Silkscreen:
J11-1
3.3V VREG
J11-2
VCC_3.3V
3.3V
J11
1
2
HDR2X1 M .1
C8
R28
1uf
300 Ohm
R26
0 Ohm
D1
LED Green 0805
Silkscreen:
3.3V VREG
1
VBUS
VBUS
2
USB2_DM
3
USB2_DP
4
0.1uF
C3
TX2P_Conn
9
TX2N_Conn
8
C4
0.1uF
7
6
RX1P
5
RX1N
MODE
VCC_3.3V
C15
C9
C10
C11
C13
C12
C14
1uF
0.1uF
0.01uF
1uF
0.01uF
22uF
0.1uF
Copyright © 2016, Texas Instruments Incorporated
TUSB1002 Evaluation Module
PCB Construction
P2
VBUS
USB2_DM
USB2_DP
GND
SS_TX_P
SS_TX_N
GND_Drain
11
SS_RX_P
Shield2
10
SS_RX_N
Shield1
USB3 Type A Receptacle
7

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TUSB1002EVM and is the answer not in the manual?

Table of Contents