All LEDs turn on while the inverter is being configured.
AC and DC conduit entries: Connection points of the StorEdge Connection Unit.
l
ON/OFF switch: Turning this switch ON starts the operation of the power optimizers, enables power
l
production and allows the inverter to begin exporting power to the utility grid/backed-up loads.
Turning it OFF reduces the power optimizer voltage to a low safety voltage and inhibits exportation of
power. When this switch is OFF, the inverter control circuitry remains powered up.
LCD light button: Pressing this button lights up the LCD for 30 seconds. In addition, you can press
l
this button to access configuration menu options, as described Configuring the Inverter Using the LCD
Light Button on page 43.
Two communication glands, for connection of inverter communication options. Each gland has
l
three openings. Refer to Setting Up Communication to the Monitoring Portal on page 71 for more
information.
StorEdge Connection Unit Interfaces
The following components are part of the StorEdge Connection Unit and may be accessed for
troubleshooting or maintenance.
SolarEdge-StorEdge Installation Guide MAN-01-00262-1.0
Figure 8: Inverter front view
Figure 9: StorEdge Connection Unit
Chapter 3: Installing the Inverter
19