DC/DC converters capable of driving up to 4 A of load current from an input voltage of 3.8 V to 36 V. The LMR33640EVM features a selectable output voltage of 3.3 V or 5 V and a switching frequency of either 400 kHz.
This section describes the test points and connectors on the EVM and how to properly connect, set up, and use the LMR33640EVM. Either the banana jacks and test points on the top of the board or the card edge connector can be used for connections. See...
Bill of Materials www.ti.com Bill of Materials Table 2. BOM for LMR33640EVM DESIGNATOR IDENTIFIER DESCRIPTION MANUFACTURER PART NUMBER Cblk CAP, AL, 100 µF, 50 V, ±20%, SMD Chemi-Con EMVA500ADA101MHA0G CAP, CERM, 10 µF, 50 V, ±10%, X5R, Samsung CL31A106KBHNNNE 1206_190 CAP, CERM, 0.22 µF, 50 V, ±10%,...
Page 12
STANDARD TERMS FOR EVALUATION MODULES Delivery: TI delivers TI evaluation boards, kits, or modules, including any accompanying demonstration software, components, and/or documentation which may be provided together or separately (collectively, an “EVM” or “EVMs”) to the User (“User”) in accordance with the terms set forth herein.
Page 13
www.ti.com Regulatory Notices: 3.1 United States 3.1.1 Notice applicable to EVMs not FCC-Approved: FCC NOTICE: This kit is designed to allow product developers to evaluate electronic components, circuitry, or software associated with the kit to determine whether to incorporate such items in a finished product and software developers to write software applications for use with the end product.
Page 14
www.ti.com Concernant les EVMs avec antennes détachables Conformément à la réglementation d'Industrie Canada, le présent émetteur radio peut fonctionner avec une antenne d'un type et d'un gain maximal (ou inférieur) approuvé pour l'émetteur par Industrie Canada. Dans le but de réduire les risques de brouillage radioélectrique à...
Page 15
www.ti.com EVM Use Restrictions and Warnings: 4.1 EVMS ARE NOT FOR USE IN FUNCTIONAL SAFETY AND/OR SAFETY CRITICAL EVALUATIONS, INCLUDING BUT NOT LIMITED TO EVALUATIONS OF LIFE SUPPORT APPLICATIONS. 4.2 User must read and apply the user guide and other available documentation provided by TI regarding the EVM prior to handling or using the EVM, including without limitation any warning or restriction notices.
Need help?
Do you have a question about the LMR33640EVM and is the answer not in the manual?
Questions and answers