www.ti.com
User's Guide
LMR38020EVM User Guide
The LMR38020EVM is a 80 V DC/DC buck regulator that employs synchronous rectification to achieve high
conversion efficiency in a small footprint. The EVM operates over a wide input voltage range of 6 V to 80 V
to provide a regulated 5 V output at 400 kHz switching frequency. The output voltage has better than 1.5%
setpoint accuracy and is adjustable using an external resistor divider. The module design uses the LMR38020F
synchronous buck converter with wide input voltage (wide V
side and low-side power MOSFETs, cycle-by-cycle overcurrent protection, and precision enable. The LMR38020
converter is available in an 8-pin SO PowerPAD
solutions. The LMR38020EVM evaluation module is qualified for the LMR38020 as well as the LMR38020-Q1
buck converter. See
Table 1-1
CONVERTER
U1
2 LMR38020 Evaluation Module...............................................................................................................................................
Procedure........................................................................................................................................................4
2.2 Detailed Descriptions.........................................................................................................................................................
3
Schematic................................................................................................................................................................................7
Layout..............................................................................................................................................................................8
Materials......................................................................................................................................................................11
Figure 3-1. LMR38020EVM Schematic.......................................................................................................................................
Figure 4-3. Mid-Layer 2 Routing..................................................................................................................................................
Routing..............................................................................................................................................10
Trademarks
PowerPAD
™
is a trademark of Texas Instruments.
All trademarks are the property of their respective owners.
SNVU787 - JULY 2021
Submit Document Feedback
ABSTRACT
™
package to enable high density, low component count DC/DC
for package information.
Table 1-1. Device and Package Configurations
IC
LMR38020-Q1
8-pin SO package with PowerPAD (4.89 mm × 3.90 mm)
LMR38020
Table of Contents
List of Figures
View..........................................................................................................................................4
List of Tables
Configurations...........................................................................................................................1
Materials................................................................................................................................11
Copyright © 2021 Texas Instruments Incorporated
) range, wide duty-cycle range, integrated high-
IN
PACKAGE
Table of Contents
2
4
5
7
8
9
9
LMR38020EVM User Guide
1
Need help?
Do you have a question about the LMR38020EVM and is the answer not in the manual?
Questions and answers