Advertisement

Quick Links

The Texas Instruments LMR33630 EVM evaluation module (EVM) helps designers evaluate the operation
and performance of the LMR33630 buck regulator. The LMR336x0 is a family of easy-to-use synchronous
step-down DC/DC converters capable of driving up to 3 A of load current from an input voltage of 3.8 V to
36 V. The LMR33630 EVM features a selectable output voltage of 3.3 V or 5 V and a switching frequency
of either 400 kHz or 2.1 MHz. See the LMR33630 data sheet for additional features, detailed description,
and available options.
The EVM options are found in
LMR33630ADDAEVM
LMR33630CDDAEVM
..........................................................................................................................
1
.....................................................................................................................
2
3
.....................................................................................................................
4
5
6
Bill of Materials
1
EVM Board Connections
2
EVM Card Edge Connections
3
Jumper Locations
...................................................................................................................
4
FRA Set-up
5
Efficiency: V
IN
6
Efficiency: V
IN
7
LMR33630EVM Schematic
8
9
10
11
12
1
Device and Package Configurations
2
3
BOM for LMR33630CDDAEVM
Trademarks
All trademarks are the property of their respective owners.
SNVU573A - August 2017 - Revised March 2018
Submit Documentation Feedback
Table
1.
Table 1. Device and Package Configurations
EVM
LMR33630ADDA
LMR33630CDDA
........................................................................................................
.................................................................................................................
.............................................................................................................
....................................................................................................
..............................................................................................
............................................................................................................
.....................................................................................
= 12 V, ƒ
= 2.1 MHz
SW
.....................................................................................
= 12 V, ƒ
= 400 kHz
SW
.................................................................................................
............................................................................................................
.....................................................................................................
.......................................................................................................
.......................................................................................................
...............................................................................................
......................................................................................
..........................................................................................
..........................................................................................
Copyright © 2017-2018, Texas Instruments Incorporated
SNVU573A - August 2017 - Revised March 2018
LMR33630 EVM User's Guide
DEVICE
FREQUENCY / Output Current
Contents
List of Figures
List of Tables
User's Guide
400 kHz / 3A
2100 kHz / 3A
LMR33630 EVM User's Guide
2
5
6
7
8
13
2
3
4
5
6
6
7
8
9
10
11
12
1
13
14
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the LMR33630EVM and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments LMR33630EVM

  • Page 1: Table Of Contents

    SNVU573A – August 2017 – Revised March 2018 LMR33630 EVM User’s Guide The Texas Instruments LMR33630 EVM evaluation module (EVM) helps designers evaluate the operation and performance of the LMR33630 buck regulator. The LMR336x0 is a family of easy-to-use synchronous step-down DC/DC converters capable of driving up to 3 A of load current from an input voltage of 3.8 V to...
  • Page 2: Setup

    This section describes the test points and connectors on the EVM and how to properly connect, set up and use the LMR33630EVM. Either the banana jacks and test points on the top of the board can be used for connections, or the card edge connector can be used. Please refer to...
  • Page 3 VOUT - This jumper is used to select one of the two pre-defined output voltages. The "3.3V" position provides a 3.3 V output; while the "5V" position provides a 5 V output. SNVU573A – August 2017 – Revised March 2018 LMR33630 EVM User’s Guide Submit Documentation Feedback Copyright © 2017–2018, Texas Instruments Incorporated...
  • Page 4 • A - Connection for frequency response analyzer (on bottom of board). See Figure 4 LMR33630 EVM User’s Guide SNVU573A – August 2017 – Revised March 2018 Submit Documentation Feedback Copyright © 2017–2018, Texas Instruments Incorporated...
  • Page 5: Operation

    In this way the power supply system can be tested before committing the design to production. SNVU573A – August 2017 – Revised March 2018 LMR33630 EVM User’s Guide Submit Documentation Feedback Copyright © 2017–2018, Texas Instruments Incorporated...
  • Page 6: Performance Curves

    Figure 5. Efficiency: V = 12 V, ƒ = 2.1 MHz Figure 6. Efficiency: V = 12 V, ƒ = 400 kHz LMR33630 EVM User’s Guide SNVU573A – August 2017 – Revised March 2018 Submit Documentation Feedback Copyright © 2017–2018, Texas Instruments Incorporated...
  • Page 7: Schematic

    Schematic www.ti.com Schematic Figure 7. LMR33630EVM Schematic SNVU573A – August 2017 – Revised March 2018 LMR33630 EVM User’s Guide Submit Documentation Feedback Copyright © 2017–2018, Texas Instruments Incorporated...
  • Page 8: Board Layout

    Board Layout www.ti.com Board Layout Figure 8. Top View of EVM LMR33630 EVM User’s Guide SNVU573A – August 2017 – Revised March 2018 Submit Documentation Feedback Copyright © 2017–2018, Texas Instruments Incorporated...
  • Page 9: Evm Top Copper Layer

    Board Layout www.ti.com Figure 9. EVM Top Copper Layer SNVU573A – August 2017 – Revised March 2018 LMR33630 EVM User’s Guide Submit Documentation Feedback Copyright © 2017–2018, Texas Instruments Incorporated...
  • Page 10: Evm Mid Layer One

    Board Layout www.ti.com Figure 10. EVM Mid Layer One LMR33630 EVM User’s Guide SNVU573A – August 2017 – Revised March 2018 Submit Documentation Feedback Copyright © 2017–2018, Texas Instruments Incorporated...
  • Page 11: Evm Mid Layer Two

    Board Layout www.ti.com Figure 11. EVM Mid Layer Two SNVU573A – August 2017 – Revised March 2018 LMR33630 EVM User’s Guide Submit Documentation Feedback Copyright © 2017–2018, Texas Instruments Incorporated...
  • Page 12: Evm Bottom Copper Layer

    Board Layout www.ti.com Figure 12. EVM Bottom Copper Layer LMR33630 EVM User’s Guide SNVU573A – August 2017 – Revised March 2018 Submit Documentation Feedback Copyright © 2017–2018, Texas Instruments Incorporated...
  • Page 13: Bom For Lmr33630Addaevm

    SIMPLE SWITCHER 3.8V to 36V 3A/2A Texas Instruments LMR33630ADDA Synchronous Step-Down CAP, CERM, 10 pF, 50 V, +/- 5%, C0G/NP0, MuRata GRM1885C1H100JA01D 0603 SNVU573A – August 2017 – Revised March 2018 LMR33630 EVM User’s Guide Submit Documentation Feedback Copyright © 2017–2018, Texas Instruments Incorporated...
  • Page 14 SIMPLE SWITCHER 3.8V to 36V 3A/2A Texas Instruments LMR33630CDDA Synchronous Step-Down CAP, CERM, 10 pF, 50 V, +/- 5%, C0G/NP0, MuRata GRM1885C1H100JA01D 0603 LMR33630 EVM User’s Guide SNVU573A – August 2017 – Revised March 2018 Submit Documentation Feedback Copyright © 2017–2018, Texas Instruments Incorporated...
  • Page 15 NOTE: Page numbers for previous revisions may differ from page numbers in the current version. Changes from Original (August 2017) to A Revision ..................... Page ........................... • Added Section 3 SNVU573A – August 2017 – Revised March 2018 Revision History Submit Documentation Feedback Copyright © 2017–2018, Texas Instruments Incorporated...
  • Page 16 STANDARD TERMS FOR EVALUATION MODULES Delivery: TI delivers TI evaluation boards, kits, or modules, including any accompanying demonstration software, components, and/or documentation which may be provided together or separately (collectively, an “EVM” or “EVMs”) to the User (“User”) in accordance with the terms set forth herein.
  • Page 17 FCC Interference Statement for Class B EVM devices NOTE: This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation.
  • Page 18 【無線電波を送信する製品の開発キットをお使いになる際の注意事項】 開発キットの中には技術基準適合証明を受けて いないものがあります。 技術適合証明を受けていないもののご使用に際しては、電波法遵守のため、以下のいずれかの 措置を取っていただく必要がありますのでご注意ください。 1. 電波法施行規則第6条第1項第1号に基づく平成18年3月28日総務省告示第173号で定められた電波暗室等の試験設備でご使用 いただく。 2. 実験局の免許を取得後ご使用いただく。 3. 技術基準適合証明を取得後ご使用いただく。 なお、本製品は、上記の「ご使用にあたっての注意」を譲渡先、移転先に通知しない限り、譲渡、移転できないものとします。 上記を遵守頂けない場合は、電波法の罰則が適用される可能性があることをご留意ください。 日本テキサス・イ ンスツルメンツ株式会社 東京都新宿区西新宿6丁目24番1号 西新宿三井ビル 3.3.3 Notice for EVMs for Power Line Communication: Please see http://www.tij.co.jp/lsds/ti_ja/general/eStore/notice_02.page 電力線搬送波通信についての開発キットをお使いになる際の注意事項については、次のところをご覧ください。http:/ /www.tij.co.jp/lsds/ti_ja/general/eStore/notice_02.page 3.4 European Union 3.4.1 For EVMs subject to EU Directive 2014/30/EU (Electromagnetic Compatibility Directive): This is a class A product intended for use in environments other than domestic environments that are connected to a low-voltage power-supply network that supplies buildings used for domestic purposes.
  • Page 19 Notwithstanding the foregoing, any judgment may be enforced in any United States or foreign court, and TI may seek injunctive relief in any United States or foreign court. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2018, Texas Instruments Incorporated...
  • Page 20 IMPORTANT NOTICE FOR TI DESIGN INFORMATION AND RESOURCES Texas Instruments Incorporated (‘TI”) technical, application or other design advice, services or information, including, but not limited to, reference designs and materials relating to evaluation modules, (collectively, “TI Resources”) are intended to assist designers who are developing applications that incorporate TI products;...

This manual is also suitable for:

Lmr33630addaevmLmr33630cddaevm

Table of Contents