Planning How To Position The Chassis In The Rack - Cisco N9K-C93128TX Hardware Installation Manual

Aci-mode switch
Table of Contents

Advertisement

Installing the Chassis
The shipment should include the following:
• Switch chassis, which includes the following installed components:
• One uplink module:
• M6PQ uplink module
• M6PQ-E uplink module
• M12PQ uplink module
• Two power supplies (any combination of the following with the airflow direction being the same as for the fan
modules):
• 1200-W AC power supply
• 930-W DC power supply
• Three fan modules (all fan and power supply modules must have the same airflow direction)
• Port-side exhaust airflow with blue coloring (N9K-C9300-FAN2-B)
• Port-side intake airflow with burgundy coloring (N9K-C9300-FAN2)
• Switch accessory kit
• Rack mount kit
Step 2
Check the contents of the box for damage.
Step 3
If you notice any discrepancies or damage, send the following information to your customer service representative by
email:
• Invoice number of the shipper (see the packing slip)
• Model and serial number of the missing or damaged unit
• Description of the problem and how it affects the installation

Planning How to Position the Chassis in the Rack

The switch is designed so that you can have coolant air flow through the switch in one of the two following
directions:
• Enter the port side and exhaust out the power supply side (port-side intake airflow)
• Port-side exhaust airflow with blue coloring (N9K-PAC-1200W-B)
• Port-side intake airflow with burgundy coloring (N9K-PAC-1200W)
• Port-side exhaust airflow with gray coloring (UCS-PSU-6332-DC)
• Port-side intake airflow with green coloring (UCSC-PDU-930WDC)

Planning How to Position the Chassis in the Rack

Cisco Nexus 93128TX ACI-Mode Switch Hardware Installation Guide
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nexus 93128tx

Table of Contents