Operation Manual / A130-M.. - A145-M..
7 Periodic maintenance work / 7.3 Cleaning the turbine during opera-
tion
Fig. 32: Carrying out wet cleaning of turbine
Fulfil prerequisites.
u
Ensure that the water supply (01) is guaranteed.
u
Open the stop valve (02) and set the required water pressure at the manometer (3) (see
u
cleaning parameters in the table
ating state
→70)).
If an optional flowmeter (04) is present, set the water volume flow V
cleaning parameters in the table
→71).
Close the stop valve (02) after 10 minutes.
u
Wait for 10 minutes; do not change the load during this stabilisation phase.
u
If the cleaning result is unsatisfactory or there is water leakage, contact a Turbo Systems
service station.
Product
Temperature be-
fore turbine before
cleaning [°C]
A130
350 ... 430
A135
350 ... 430
A140
350 ... 430
A145
350 ... 430
Table 16: Wet cleaning of turbine, parameters
1)
Corresponds to a water pressure p
© Copyright 2022 ABB. All rights reserved.
(see Table 15: Turbine wet cleaning, recommended oper-
(see Table 16: Wet cleaning of turbine, parameters
Maximum temper-
Water volume flow
ature before tur-
bine during clean-
ing [°C]
530
530
530
530
of 1.5 bar (overpressure compared to atmosphere)
WT
HZTL4031_EN
on the basis of the
W
Injection time
3
1)
V
[dm
/min] 
W
4.0
5.5
8.5
12.0
Rev.P
[min]
10
10
10
10
February 2022